4. Commissioning
4−11
Festo P.BE−CPVSC−E N en 0301a
Caution
Before commissioning your machine/system:
·
Make sure that double−solenoid valves (Ident. code J)
are in their basic positions again. To do this actuate
manual override 12 of the relevant valve or apply current
to pilot solenoid 12.
·
Bring the locking manual override actuations into the
basic position again.
In this way you will avoid undefined switching states when
commissioning the machine/system.
Actuating the manual override with stop (locking)
Reaction of the valve
Use a screwdriver to carefully
press down the plunger of the
manual override as far as
possible. Then turn it 90° in a
clockwise direction.
The valve
moves to the switching
position
Leave the plunger in the lower
position.
remains in the switch
position
Then turn it 90° in an anti−
clockwise direction. Then
release the plunger.
moves back to the basic
position
(not with 5/2−way
double−solenoid valve,
Ident. code J)
Tab.4/6:
Locking manual override
Summary of Contents for Smart cubic CPVSC1-VI
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0301a...
Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0301a...
Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0301a Chapter 1...
Page 22: ...1 Summary of components 1 10 Festo P BE CPVSC EN en 0301a...
Page 23: ...Fitting 2 1 Festo P BE CPVSC EN en 0301a Chapter 2...
Page 31: ...Installation 3 1 Festo P BE CPVSC EN en 0301a Chapter 3...
Page 50: ...3 Installation 3 20 Festo P BE CPVSC EN en 0301a...
Page 51: ...Commissioning 4 1 Festo P BE CPVSC EN en 0301a Chapter 4...
Page 66: ...4 Commissioning 4 16 Festo P BE CPVSC EN en 0301a...
Page 67: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0301a Chapter 5...
Page 77: ...Technical appendix A 1 Festo P BE CPVSC EN en 0301a Appendix A...
Page 87: ...Index B 1 Festo P BE CPVSC EN en 0301a Appendix B...
Page 88: ...B Index B 2 Festo P BE CPVSC EN en 0301a Contents B Index B 1 B 1 Index B 3...