3. Installation
3−3
Festo P.BE−CPVSC−E N en 0301a
Contents of this chapter
This chapter describes the tubing and cabling of the CPV−SC
valve terminal. The following in particular belong here:
general instructions on preparing the compressed air and
on connecting the tubing
instructions on pilot control of the valve solenoid coils
with internal or external auxiliary pilot air
instructions on operating CPV−SC valve terminals with
pressure zone separation
fitting the QS screw connectors
connecting the power supply
address assignment of the valves.
Further information
Instructions on connecting the electric components of the
CPV−SC valve terminal with MP−connection can be found in
the leaflet supplied with the product.
Summary of Contents for Smart cubic CPVSC1-VI
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0301a...
Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0301a...
Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0301a Chapter 1...
Page 22: ...1 Summary of components 1 10 Festo P BE CPVSC EN en 0301a...
Page 23: ...Fitting 2 1 Festo P BE CPVSC EN en 0301a Chapter 2...
Page 31: ...Installation 3 1 Festo P BE CPVSC EN en 0301a Chapter 3...
Page 50: ...3 Installation 3 20 Festo P BE CPVSC EN en 0301a...
Page 51: ...Commissioning 4 1 Festo P BE CPVSC EN en 0301a Chapter 4...
Page 66: ...4 Commissioning 4 16 Festo P BE CPVSC EN en 0301a...
Page 67: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0301a Chapter 5...
Page 77: ...Technical appendix A 1 Festo P BE CPVSC EN en 0301a Appendix A...
Page 87: ...Index B 1 Festo P BE CPVSC EN en 0301a Appendix B...
Page 88: ...B Index B 2 Festo P BE CPVSC EN en 0301a Contents B Index B 1 B 1 Index B 3...