2. Fitting the CPV valve terminal
CPV valve terminal with pneumatic multiple connector
plate
•
Place the 3-seal and 4-seal strips in the recesses in
the left or right-hand end plate. Press the 2-seal
strips carefully into the threads of the work connec-
tions.
•
Place the CPV valve terminal on the pneumatic
multiple connector plate and tighten the fastening
screws in the left and right-hand end plates with 0.3
Nm. Then tighten the screws in diagonally opposite
sequence with 2 Nm (CPV10/14) or with 4 Nm
(CPV18).
CP terminal with foot fastening
•
Insert the fastening screws in the right-hand end
plate and tighten the terminal.
CPV valve terminal with wall or hat rail fastening
•
Fix the right-hand fastening onto the wall with two
M4 screws or tighten the right-hand hat rail clamping
unit.
3. Fitting the pneumatic and electrical connections
•
Fit the connections in the reverse sequence to that
described in "Removing CPV valve terminal compo-
nents".
5. Maintenance and conversion
5-12
CPV... 9811d
Summary of Contents for CPV -VI Series
Page 1: ...Compact Performance CPV valve terminal Pneumatics Typ CPV VI...
Page 2: ......
Page 4: ...Part no 165 200 Title MANUAL Designation P BE CPV GB II CPV 9811d...
Page 15: ...Chapter 1 System overview 1 System overview CPV 9811d 1 1...
Page 31: ...Chapter 2 Fitting 2 Fitting CPV 9811d 2 1...
Page 53: ...Chapter 3 Installation 3 Installation CPV 9811d 3 1...
Page 69: ...Chapter 4 Commissioning 4 Commissioning CPV 9811d 4 1...
Page 83: ...Chapter 5 Maintenance and conversion 5 Maintenance and conversion CPV 9811d 5 1...
Page 106: ...5 Maintenance and conversion 5 24 CPV 9811d...
Page 107: ...Appendix A Technical appendix A Technical appendix CPV 9811d A 1...