Checking the valve-cylinder combination
WARNING
When pressurizing or repressurizing the valve termi-
nal under the following conditions:
– with safety start-up valve
(slow pressure build-up) and
– when there is an electrical signal
(e.g. after EMERGENCY STOP)
supply the auxiliary pilot air separately (3 to 8 bar).
The auxiliary pilot air must reach its full level immedi-
ately after being switched on, otherwise the slow press-
ure build-up of the overall supply will have no effect
with cylinders actuated as follows:
– by means of single solenoid valves
– by means of double solenoid valves which are
switched to flow-through during the pressureless
phase.
The effects of slow pressure build-up when there is an
electrical signal are shown in the table below.
Separately
supplied auxiliary
pilot air
Pressure
increase in
overall supply
Pressure
increase in
auxiliary pilot
air (12/14)
Moment when
valve switches
over
Movement of
cylinder
taken behind safety
start-up valve
slow
slow
after pressure
increase at (1)
fast
taken in front of
safety start-up valve
slow
fast
before pressure
increase at (1)
slow
4. Commissioning
CPV... 9811d
4-7
Summary of Contents for CPV -VI Series
Page 1: ...Compact Performance CPV valve terminal Pneumatics Typ CPV VI...
Page 2: ......
Page 4: ...Part no 165 200 Title MANUAL Designation P BE CPV GB II CPV 9811d...
Page 15: ...Chapter 1 System overview 1 System overview CPV 9811d 1 1...
Page 31: ...Chapter 2 Fitting 2 Fitting CPV 9811d 2 1...
Page 53: ...Chapter 3 Installation 3 Installation CPV 9811d 3 1...
Page 69: ...Chapter 4 Commissioning 4 Commissioning CPV 9811d 4 1...
Page 83: ...Chapter 5 Maintenance and conversion 5 Maintenance and conversion CPV 9811d 5 1...
Page 106: ...5 Maintenance and conversion 5 24 CPV 9811d...
Page 107: ...Appendix A Technical appendix A Technical appendix CPV 9811d A 1...