2. Commissioning
2-19
Festo P.BE-CPV-CO3-EN en 1201a
2.5
Overview of parametrizing
Designation
Set value
1
Parameters of the CPV basic unit
see Object Index 3300, Subindex 1
2
Parametrizing the CPI extensions
see Object Index 3300, Subindex 2 … 5
3
Parametrizing the reaction to faults
see Object Index 1029
Tab. 2/5:
Overview of parametrizing possibilities
2.6
Further information
Information on the Emergency Object and on diagnosis can
be found in chapter 3.
Examples of communication sequence and on operation with
Jetter controllers can be found in appendix B.
Summary of Contents for CPV...-GE-CO3-8 series
Page 2: ......
Page 14: ...Contents and general instructions XII Festo P BE CPV CO3 EN en 1201a...
Page 15: ...Installation 1 1 Festo P BE CPV CO3 EN en 1201a Chapter 1 Installation...
Page 59: ...Commissioning 2 1 Festo P BE CPV CO3 EN en 1201a Chapter 2 Commissioning...
Page 78: ...2 Commissioning 2 20 Festo P BE CPV CO3 EN en 1201a...
Page 98: ...3 Diagnosis and error treatment 3 20 Festo P BE CPV CO3 EN en 1201a...
Page 105: ...Object directories B 1 Festo P BE CPV CO3 EN en 1201a Appendix B Object directories...
Page 129: ...Examples C 1 Festo P BE CPV CO3 EN en 1201a Appendix C Examples...
Page 136: ...C Examples C 8 Festo P BE CPV CO3 EN en 1201a...
Page 137: ...Index D 1 Festo P BE CPV CO3 EN en 1201a Appendix D Index...
Page 138: ...D Index D 2 Festo P BE CPV CO3 EN en 1201a Contents D Index D 1...