1. Installation
1-39
Festo P.BE-CPV-CO3-EN en 1201a
1.7.2
Saving the string assignment
Warning
Be very careful if the string assignment of your CPI system
is modified at a later stage:
•
After saving the string assignment, check the address
assignments of your CPI system before starting user
programs.
You will then avoid addressing faults in the case of incor-
rectly fitted CPI/CP modules.
String assignment
The CPV Direct saves the type and the sequence of the
connected CPI/CP modules for the CP string (string
assignment).
The saved string assignment enables the CPV Direct to avoid
faults in connecting, and thus addresssing. It checks auto-
matically to see if the current string assignment is the same
as the saved assignment. A distinction is made here between
the following test phases:
–
testing during the start-up phase (see section 1.8)
–
testing during operation (see section 1.9).
When the status LEDs on all the CPI/CP modules light up, the
CPI system is prepared for commissioning. You can now com-
mission the CPI system.
Summary of Contents for CPV...-GE-CO3-8 series
Page 2: ......
Page 14: ...Contents and general instructions XII Festo P BE CPV CO3 EN en 1201a...
Page 15: ...Installation 1 1 Festo P BE CPV CO3 EN en 1201a Chapter 1 Installation...
Page 59: ...Commissioning 2 1 Festo P BE CPV CO3 EN en 1201a Chapter 2 Commissioning...
Page 78: ...2 Commissioning 2 20 Festo P BE CPV CO3 EN en 1201a...
Page 98: ...3 Diagnosis and error treatment 3 20 Festo P BE CPV CO3 EN en 1201a...
Page 105: ...Object directories B 1 Festo P BE CPV CO3 EN en 1201a Appendix B Object directories...
Page 129: ...Examples C 1 Festo P BE CPV CO3 EN en 1201a Appendix C Examples...
Page 136: ...C Examples C 8 Festo P BE CPV CO3 EN en 1201a...
Page 137: ...Index D 1 Festo P BE CPV CO3 EN en 1201a Appendix D Index...
Page 138: ...D Index D 2 Festo P BE CPV CO3 EN en 1201a Contents D Index D 1...