2. Commissioning
2-15
Festo P.BE-CPV-CO3-EN en 1201a
Note
Please note the following if the outputs are reset after
PLC stop, field bus interruption or fault:
– Single-solenoid valves move to the basic position.
– Double-solenoid valves remain in the current position.
– Mid-position valves move to the mid-position (depend-
ing on valve type: pressurized, exhausted or blocked).
2.3.6
Manufacturer Specific Condition Monitoring
Examples see section B.1.5.
2.3.7
Module parameters
Further information on the module parameters see
CPI system description CP-BE-CPX-CP-...
Summary of Contents for CPV...-GE-CO3-8 series
Page 2: ......
Page 14: ...Contents and general instructions XII Festo P BE CPV CO3 EN en 1201a...
Page 15: ...Installation 1 1 Festo P BE CPV CO3 EN en 1201a Chapter 1 Installation...
Page 59: ...Commissioning 2 1 Festo P BE CPV CO3 EN en 1201a Chapter 2 Commissioning...
Page 78: ...2 Commissioning 2 20 Festo P BE CPV CO3 EN en 1201a...
Page 98: ...3 Diagnosis and error treatment 3 20 Festo P BE CPV CO3 EN en 1201a...
Page 105: ...Object directories B 1 Festo P BE CPV CO3 EN en 1201a Appendix B Object directories...
Page 129: ...Examples C 1 Festo P BE CPV CO3 EN en 1201a Appendix C Examples...
Page 136: ...C Examples C 8 Festo P BE CPV CO3 EN en 1201a...
Page 137: ...Index D 1 Festo P BE CPV CO3 EN en 1201a Appendix D Index...
Page 138: ...D Index D 2 Festo P BE CPV CO3 EN en 1201a Contents D Index D 1...