2. Commissioning
2-17
Festo P.BE-CPV-CO3-EN en 1201a
I/O assignment of the tool change configuration:
Device
Assigned I/Os
Default PDO mapping
Objects
CPV basic unit
16O
RxPDO, byte 0 … 1
6200.1-2
CPI extension
32I
TxPDO, byte 0 … 3
6000.1-4
32O
RxPDO, byte 2 … 5
6200.3-6
Tab. 2/2:
Example of I/O assignment of the tool change configuration
Configuration
Advantages
Disadvantages
Standard
– Good diagnostic possibilities
– Protection against confusion of the
modules on the CPI string
– Modifications to the CPI extension
string must be configured again.
Tool change
configuration
– Modifications to the CPI extension
string are possible without new
configuration.
– Can be configured
– Limited diagnostic possibilities
– Address assignment of the
exchangeable configurations must
be carried out very carefully.
Tab. 2/3:
Advantages and disadvantages of the tool change configuration
Summary of Contents for CPV...-GE-CO3-8 series
Page 2: ......
Page 14: ...Contents and general instructions XII Festo P BE CPV CO3 EN en 1201a...
Page 15: ...Installation 1 1 Festo P BE CPV CO3 EN en 1201a Chapter 1 Installation...
Page 59: ...Commissioning 2 1 Festo P BE CPV CO3 EN en 1201a Chapter 2 Commissioning...
Page 78: ...2 Commissioning 2 20 Festo P BE CPV CO3 EN en 1201a...
Page 98: ...3 Diagnosis and error treatment 3 20 Festo P BE CPV CO3 EN en 1201a...
Page 105: ...Object directories B 1 Festo P BE CPV CO3 EN en 1201a Appendix B Object directories...
Page 129: ...Examples C 1 Festo P BE CPV CO3 EN en 1201a Appendix C Examples...
Page 136: ...C Examples C 8 Festo P BE CPV CO3 EN en 1201a...
Page 137: ...Index D 1 Festo P BE CPV CO3 EN en 1201a Appendix D Index...
Page 138: ...D Index D 2 Festo P BE CPV CO3 EN en 1201a Contents D Index D 1...