D 133
When work is finished
- Run the paver empty, then bring it to a stop.
- Turn drive lever (20) to the center position. Move the preselector (12) and selector (21) to
minimum position.
- Switch off co auger (45), vibration (27), and lights (25).
- Lift the screed by using switch (52).
- Retract the screed parts to the basic screed width with switches (50) and (51).
- Use switch (47) and (48) to lift the auger.
- Where applicable, completely extend the leveling cylinders by using switches (54) and (55).
- Insert the mechanical screed transport safeguard (74)
on both screed lifting cylinders.
- While operating the tampers at a low speed, let any
material residue drop out.
Switch the ignition (10) off
- Switch screed heater (system) off.
- Remove the leveling units and stow them away in their
boxes and close the boxes.
- Remove all parts that extend beyond the paver width.
Secure them if the paver is to be transported over public roads on a low-bed trailer.
74
Do not turn the main switch off until 100 seconds after
the ignition has been turned off!
The engine electronics require this length of time to
back
up data, and such device can prevent the engine’s
electronic control module (ECM) from sustaining damage
and battery discharging.
- Read and check the operating hour meter to determine
whether maintenance work must be performed (see
chapter F).
- Cover and lock the operation panel, so as to restrain
unauthorized persons from starting and operating the
machine.
- Remove material residue from the screed and the paver and spray all parts with releas
e
agent fluid.
Summary of Contents for DYNAPAC F1000T T4f
Page 2: ...www G QDSDF com ...
Page 20: ...B 12 5 Location of instruction labels and identification plates ...
Page 27: ...B 19 ...
Page 31: ...C 4 ...
Page 36: ...C 9 ...
Page 38: ...C 11 3 2 Driving mode ...
Page 45: ...D 2 2 Controls 2 1 Operating panel Left Hand Operator s Panel Right Hand Operator s Panel ...
Page 49: ...D 6 PANEL B Left Hand Operator s Panel Right Hand Operator s Panel ...
Page 51: ...D 8 PANEL B Left Hand Operator s Panel Right Hand Operator s Panel ...
Page 53: ...D 10 PANEL B Left Hand Operator s Panel Right Hand Operator s Panel ...
Page 55: ...D 12 PANEL C ...
Page 57: ...D 14 PANEL C 45 40 49 42 41 47 44 43 48 ...
Page 59: ...D 16 PANEL C 45 40 49 42 41 47 44 43 48 ...
Page 61: ...D 18 PANEL D 53 52 54 51 55 50 53 52 51 50 ...
Page 63: ...D 20 PANEL D 53 52 54 51 55 50 53 52 51 50 ...
Page 65: ...D 22 PANEL D 53 52 54 51 55 50 53 52 51 50 ...
Page 67: ...D 24 PANEL E 56 57 58 ...
Page 69: ...D 26 PANEL E 56 57 58 ...
Page 71: ...D 28 PANEL E 56 57 58 ...
Page 73: ...D 30 3 Auxiliary functions 60 61 62 63 ...
Page 86: ...D 43 Left right handset 101 103 105 107 104 106 102 100 ...
Page 88: ...D 45 101 103 105 107 104 106 102 100 ...
Page 107: ...D 64 1 2 Engine Error messages ...
Page 108: ...D 65 ...
Page 109: ...D 66 ...
Page 110: ...D 67 ...
Page 111: ...D 68 ...
Page 112: ...D 69 ...
Page 113: ...D 70 ...
Page 114: ...D 71 ...
Page 115: ...D 72 ...
Page 116: ...D 73 ...
Page 117: ...D 74 ...
Page 118: ...D 75 ...
Page 119: ...D 76 ...
Page 120: ...D 77 ...
Page 121: ...D 78 ...
Page 122: ...D 79 ...
Page 123: ...D 80 ...
Page 124: ...D 81 ...
Page 125: ...D 82 ...
Page 126: ...D 83 ...
Page 127: ...D 84 ...
Page 128: ...D 85 ...
Page 129: ...D 86 ...
Page 130: ...D 87 ...
Page 131: ...D 88 ...
Page 132: ...D 89 ...
Page 133: ...D 90 ...
Page 134: ...D 91 ...
Page 135: ...D 92 ...
Page 136: ...D 93 ...
Page 137: ...D 94 ...
Page 138: ...D 95 ...
Page 139: ...D 96 ...
Page 140: ...D 97 ...
Page 141: ...D 98 ...
Page 142: ...D 99 ...
Page 143: ...D 100 ...
Page 144: ...D 101 ...
Page 145: ...D 102 ...
Page 146: ...D 103 ...
Page 147: ...D 104 ...
Page 159: ...D 116 ...
Page 161: ...D 118 ...
Page 163: ...D 120 ...
Page 165: ...D 122 ...
Page 168: ...D 125 ...
Page 170: ...D 127 ...
Page 173: ...D 130 ...
Page 175: ...D 132 ...
Page 193: ...E 11 ...
Page 195: ...F 2 F 2 0 Maintenance overview 1 Maintenance overview ...
Page 197: ...F 4 F 3 0 Maintenance Conveyor and Hopper 1 Maintenance Conveyor and hopper ...
Page 205: ...F 12 F 4 0 Maintenance Auger 1 Maintenance Auger ...
Page 211: ...F 18 F 5 0 Maintenance Engine 1 Maintenance engine sub unit ...
Page 226: ...F 31 F 6 0 Maintenance Hydraulic System 1 Maintenance hydraulic system ...
Page 237: ...F 42 F 7 0 Maintenance Track 1 Maintenance running gear ...
Page 246: ...F 51 F 8 0 Maintenance Electronic System 1 Maintenance Electronic system ...
Page 256: ...F 61 F 10 0 Checks Decommissioning 1 Tests check up cleaning stopping ...