
Miscellaneous
L
2
is the distance between the lashing point on the edge of the platform and the point directly sideways from the lashing
point on the roller perpendicular to the platform edge for lashing 2. The relationship for
L
1
is the same.
L
2
is the distance between the lashing point on the edge of the platform and the point directly sideways from the lashing
point on the roller perpendicular to the platform edge for lashing 2. The relationship for
L
1
is the same.
79
4812313735.pdf
2018-12-28
Securing CC1200 VI for loading
(Side along the trailer)
Securing the CC1200 VI vibratory roller
from Dynapac for transport.
Direct of travel
Roller loaded in forward
direction
1 - 2 = double lashings, i.e. one lashing with two parts secured to two different lashing mounts on
the trailer. Symmetrically located on the right and left sides.
1 - 2 = double lashings, i.e. one lashing with two parts secured to two different lashing mounts on
the trailer. Symmetrically located on the right and left sides.
3
= the two rollers are tied together to one unit.
3
= the two rollers are tied together to one unit.
4
= rubber
4
= rubber
The lashings' permitted distance interval in meters
The lashings' permitted distance interval in meters
(1 - 2: Double lashings, LC at least 1.7 tonnes (1700 daN), S
TF
300 kg (300daN))
(1 - 2: Double lashings, LC at least 1.7 tonnes (1700 daN), S
TF
300 kg (300daN))
Double L
1
Double L
2
Double L
1
Double L
2
0.1 - 2.5
0.7 - 2.5
0.1 - 2.5
0.7 - 2.5
Summary of Contents for Dynapac CC1200 VI
Page 2: ......
Page 14: ...r h 4812313735 pdf 2018 12 28...
Page 18: ...Introduction 4812313735 pdf 2018 12 28 4...
Page 28: ...Special instructions 4812313735 pdf 2018 12 28 14...
Page 36: ...Technical specifications 4812313735 pdf 2018 12 28 22...
Page 41: ...Machine description 4812313735 pdf 2018 12 28 27...
Page 76: ...Operation 4812313735 pdf 2018 12 28 62...
Page 96: ...Operating instructions Summary 4812313735 pdf 2018 12 28 82...
Page 98: ...Preventive maintenance 4812313735 pdf 2018 12 28 84...
Page 102: ...Maintenance Lubricants and symbols 4812313735 pdf 2018 12 28 88...
Page 111: ...Maintenance Maintenance schedule 4812313735 pdf 2018 12 28 Service Checklist 97...
Page 112: ...Maintenance Maintenance schedule 4812313735 pdf 2018 12 28 98...
Page 122: ...Maintenance 10h 4812313735 pdf 2018 12 28 108...
Page 176: ...Maintenance 2000h 4812313735 pdf 2018 12 28 162...
Page 194: ...Maintenance 3000h 4812313735 pdf 2018 12 28 180...
Page 196: ...Maintenance every 12th month Annually 4812313735 pdf 2018 12 28 182...
Page 200: ......