
Miscellaneous
4812313735.pdf
2018-12-28
Unlocking the articulation
Remember to unlock the articulation before
operating.
Fold the locking arm (3) back and secure it in the
locking lug (4) with the stud (3). Insert the locking pin
(2) fitted with a wire, to secure the stud (3). The
locking lug (4) is located on the front frame.
Towing/Recovering
The roller can be moved up to 300 meters (330 yards)
using the instructions below.
68
1
3
4
2
Fig. Articulation in the open position
1. Locking arm
2. Locking pin
3. Locking stud
4. Locking lug
Remember to unlock the articulation before
operating.
Summary of Contents for Dynapac CC1200 VI
Page 2: ......
Page 14: ...r h 4812313735 pdf 2018 12 28...
Page 18: ...Introduction 4812313735 pdf 2018 12 28 4...
Page 28: ...Special instructions 4812313735 pdf 2018 12 28 14...
Page 36: ...Technical specifications 4812313735 pdf 2018 12 28 22...
Page 41: ...Machine description 4812313735 pdf 2018 12 28 27...
Page 76: ...Operation 4812313735 pdf 2018 12 28 62...
Page 96: ...Operating instructions Summary 4812313735 pdf 2018 12 28 82...
Page 98: ...Preventive maintenance 4812313735 pdf 2018 12 28 84...
Page 102: ...Maintenance Lubricants and symbols 4812313735 pdf 2018 12 28 88...
Page 111: ...Maintenance Maintenance schedule 4812313735 pdf 2018 12 28 Service Checklist 97...
Page 112: ...Maintenance Maintenance schedule 4812313735 pdf 2018 12 28 98...
Page 122: ...Maintenance 10h 4812313735 pdf 2018 12 28 108...
Page 176: ...Maintenance 2000h 4812313735 pdf 2018 12 28 162...
Page 194: ...Maintenance 3000h 4812313735 pdf 2018 12 28 180...
Page 196: ...Maintenance every 12th month Annually 4812313735 pdf 2018 12 28 182...
Page 200: ......