![Faster GLOVEFAST ASEPTIC Operating And Maintenance Manual Download Page 6](http://html1.mh-extra.com/html/faster/glovefast-aseptic/glovefast-aseptic_operating-and-maintenance-manual_3574741006.webp)
a D:GROUP Company
0254EN
– Rev. 06 – 09/2019
Page 6 of 65
2.C ELECTRIC CONNECTIONS AND INSTALLATION OF THE WORK SURFACE
The electrical connection of the GLOVEFAST ASEPTIC isolator is made by connecting the power cable
located on the top of the right side of the isolator to a suitable power point (see technical table). When the
isolator is connected, the green light on the control panel switches on (see chapter 5).
If stipulated by local legislation, insert upstream of the power line an automatic protection overload switch
provided with a differential relay, with a rated switching voltage no greater than 30 mA.
The GLOVEFAST ASEPTIC is supplied with an electric Air Tight Valve (ATV) to close and seal the isolator
during sterilization phase or pressure decay test.
To install the work surface, proceed as follows:
-
remove the protective paper from the work surface leant against the back of the isolator, taking care not
to scratch its surface,
-
open the safety front window by unscrewing the four screws,
-
clean the work surface with a damp cloth soaked in alcohol or soapy water or with a commonly
available product designed for stainless steel,
-
place the work surface into the work chamber, let the back to slide on the chamber's supporting bases
up to its back wall,
-
close the safety front window with four screws.
2.D POSITIONING OF THE ISOLATOR ON THE SUPPORTING TABLE
GLOVEFAST ASEPTIC Isolators are supplied with the relevant supporting table, which they have to be
fixed to.
After assembling the supporting table (see instructions at Para. 16) place the supporting table on a flat not
sloping floor and be sure that all the parts of the isolator, that can be opened (control board panel and sash)
are locked. Then position the isolator on the table (See instructions at Para. 17).
Summary of Contents for GLOVEFAST ASEPTIC
Page 9: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 9 of 65...
Page 26: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 26 of 65 1 2...
Page 46: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 46 of 65...
Page 48: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 48 of 65 15 J DIAGRAM FOR MAINTENANCE OPERATIONS...
Page 49: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 49 of 65 16 FRONTAL DIAGRAM...
Page 50: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 50 of 65 16 A SIDE DIAGRAM...
Page 54: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 54 of 65 18 WIRING DIAGRAM...
Page 55: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 55 of 65...
Page 56: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 56 of 65...
Page 57: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 57 of 65...
Page 58: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 58 of 65...
Page 59: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 59 of 65...
Page 60: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 60 of 65...
Page 61: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 61 of 65...
Page 62: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 62 of 65...
Page 63: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 63 of 65...
Page 64: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 64 of 65...