7 OPERATING PROCEDURES
7.A PRELIMINARY CHECKS
Before carrying out any type of work, the following conditions should be verified:
– the isolator power cable is connected to a power point at a suitable voltage and frequency as per
instructions shown on the label stuck near the electric cable
– all alarm lights are off
– the work area inside the isolator is free from materials used during the previous session.
– the isolator has been sterilized in case of change in the nature of work to be carried out
7.B SWITCHING ON the GLOVEFAST ASEPTIC isolator
To start the isolator, proceed as indicated below:
1. turn on the light by pushing the button [7]
2. be sure that the frontal window is closed
3. press the main key I/0 [1] (see chapter 5C) and enter the password to switch on the ventilation. At first
the display shows “CHECK PANEL”. Then the message "STAND-BY" is displayed for about 40 seconds
and the hour-counter starts operating
4. after 40 seconds of stand-by, the isolator is ready for work. "STAND-BY" disappears from the screen
and the LAF velocity and work chamber pressure are displayed
5. wait for approx. 5 minutes before starting work
6. during this period of time, introduce into the internal work zone of the isolator only the materials which
are essential for the job
7.C SWITCHING OFF THE GLOVEFAST ASEPTIC ISOLATOR
ATTENTION: Be careful that materials in the work area can be contaminated with pathogenic
material. Behave accordingly.
At the end of the work session, proceed as follows:
1. Remove the material from the internal work chamber
2. Clean the work surface and the inside walls of the chamber, as indicated in the "Cleaning Instructions"
section (chapter 8A and 8B)
3. Let the laminar air-flow isolator run for 10 minutes after the work is over
4. Turn off the light by pushing
“LIGHT”[7]
5. press the
“main key I/0” [1] (see chapter 5C) followed by the operator password (“up-arrow”[8] 5 times,
“down-arrow”[8] 4 times, then press “SET”[10]).
Summary of Contents for GLOVEFAST ASEPTIC
Page 9: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 9 of 65...
Page 26: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 26 of 65 1 2...
Page 46: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 46 of 65...
Page 48: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 48 of 65 15 J DIAGRAM FOR MAINTENANCE OPERATIONS...
Page 49: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 49 of 65 16 FRONTAL DIAGRAM...
Page 50: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 50 of 65 16 A SIDE DIAGRAM...
Page 54: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 54 of 65 18 WIRING DIAGRAM...
Page 55: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 55 of 65...
Page 56: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 56 of 65...
Page 57: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 57 of 65...
Page 58: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 58 of 65...
Page 59: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 59 of 65...
Page 60: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 60 of 65...
Page 61: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 61 of 65...
Page 62: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 62 of 65...
Page 63: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 63 of 65...
Page 64: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 64 of 65...