15.G DOP TEST FOR HEPA FILTERS
OBJECT AND PRINCIPLE OF THE TEST:
Check of the integrity of the HEPA filters through an analysis of the filtering system, able to find out possible
small leaks and/or defects altering the efficiency of the filters and at the same time to test leaks around
gaskets.
The HEPA filter system fitted to the isolator is tested for leakage by subjecting it to an aerosol on the
upstream side and measuring passage of the aerosol to the downstream side
INSTRUMENTS TO BE USED FOR TESTING:
1.
Aerosol generator
2.
Photometer
REAGENTS:
Liquid aerosol agent composed of Emery 3004 or equivalent in concentration of 60
g/l.
Suitable measures must be taken to prevent or reduce the operator’s exposure to aerosol.
TEST PROCEDURE:
The photometer must be used at a threshold sensitivity specific to the test aerosol of 0.0001
g/l and
capable of measuring aerosol concentrations up to about 80
g/l.
The test must be performed as follows:
–
Place the aerosol generator in such a way that the aerosol produced is immediately catched by the
barrier airflow and then recycled into the intake channel
–
Switch the generator on and adjust the photometer to give a reading of 100% when sampling this
concentration
–
Ensure that the threshold of reading sensitivity of the photometer is 0.0001
g/l.
–
Operate the isolator with airflow velocity as per specs.
–
Using a sampling probe attached to the photometer scan the main and exhaust filter faces, seals and
construction joints, moving the sampling probe at not more than 30 mm/s
–
Check the values read by the photometer constantly, in order to detect possible leakage.
–
The maximum acceptable reading is 0,01%.
Summary of Contents for GLOVEFAST ASEPTIC
Page 9: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 9 of 65...
Page 26: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 26 of 65 1 2...
Page 46: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 46 of 65...
Page 48: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 48 of 65 15 J DIAGRAM FOR MAINTENANCE OPERATIONS...
Page 49: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 49 of 65 16 FRONTAL DIAGRAM...
Page 50: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 50 of 65 16 A SIDE DIAGRAM...
Page 54: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 54 of 65 18 WIRING DIAGRAM...
Page 55: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 55 of 65...
Page 56: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 56 of 65...
Page 57: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 57 of 65...
Page 58: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 58 of 65...
Page 59: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 59 of 65...
Page 60: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 60 of 65...
Page 61: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 61 of 65...
Page 62: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 62 of 65...
Page 63: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 63 of 65...
Page 64: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 64 of 65...