13 TRANSPORT, PACKING and STORAGE INSTRUCTIONS
ATTENTION: Disconnect the power and sterilize the unit before performing any of the following
operations
The following instructions are essential if the end user needs to transport, pack or store a isolator after a
period of routine use (e.g. laboratory/plant relocation):
-
If the isolator exhausts to the outside of the building or is connected to the intake channel of the air
treatment system, remove the connection tube from the isolator to the outside or isolator to the air
treatment system. Be careful not to damage or cover with dust (or any other material) the exhaust filter
of the isolator
-
Remove the work surface and cover it with a protective film
-
Close the isolator front opening
If the isolator is to be moved from one laboratory to another within the same building:
- By a forklift: put the isolator on a pallet to ensure good stability and to protect the basin under the
isolator and the front window against damage in transit
Take care not to damage protruding parts (e.g.: exhaust duct) when passing through doors/windows
If the isolator is be kept temporarily unused at final destination, cover the isolator itself with a protective film
(pluriball or expansible film) taking care to protect also the exhaust filter, especially from dust
We recommend extreme caution in long-distance moving carried out by forwarding agents (e.g. change of
address): we suggest that you use the original packaging supplied by the manufacturer with the isolator.
Packaging characteristics:
Wooden pallets of the following dimensions:
270 x 100 x 12 cm for GLOVEFAST ASEPTIC 2-4-2
300 x 100 x 12 cm for GLOVEFAST ASEPTIC 2-5-4
330 x 100 x 12 cm for GLOVEFAST ASEPTIC 2-6-4
Pluriball to wrap and protect the isolator from dust
Summary of Contents for GLOVEFAST ASEPTIC
Page 9: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 9 of 65...
Page 26: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 26 of 65 1 2...
Page 46: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 46 of 65...
Page 48: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 48 of 65 15 J DIAGRAM FOR MAINTENANCE OPERATIONS...
Page 49: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 49 of 65 16 FRONTAL DIAGRAM...
Page 50: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 50 of 65 16 A SIDE DIAGRAM...
Page 54: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 54 of 65 18 WIRING DIAGRAM...
Page 55: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 55 of 65...
Page 56: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 56 of 65...
Page 57: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 57 of 65...
Page 58: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 58 of 65...
Page 59: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 59 of 65...
Page 60: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 60 of 65...
Page 61: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 61 of 65...
Page 62: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 62 of 65...
Page 63: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 63 of 65...
Page 64: ...a D GROUP Company 0254EN Rev 06 09 2019 Page 64 of 65...