21
Revision date: 09.20.21
11291950
6
Assemble and Install Nutrient Supply Manifolds
12. Assemble the four (4) valve assemblies as shown.
13. Wrap the threads of each WF2153 adapter four or five times with the WR1095
thread sealing tape. Wrap in a direction that will not loosen when installed in the
threaded elbows of the supply manifolds.
14. Apply pvc primer and pvc cement to the PVC end of the valve assembly and slip
it into the elbow fitting at the end of a manifold assembly. Repeat to install all
remaining valve assemblies. Valves will all be at the same end when manifolds
are attached to the frame.
15. Snap upper manifold and first lower manifold assemblies into place. Measure
length needed for first vertical pvc pipe and cut a piece of 3/4" pvc pipe to
that length. Remember to allow enough length for pipe to connect two supply
manifolds.
Do not cut the pipe too short.
Dry fit pipe before adding pvc primer and cement.
Upper Manifold Assembly
Lower Manifold Assembly
Step 16:
Measure distance needed to
connect manifolds. Pipe must be long
enough to insert into each fitting.
ASSEMBLE AND INSTALL NUTRIENT SUPPLY MANIFOLDS—CONTINUED
WF2153 WF3310
WF4130 (2-1/2")