15
Revision date: 09.20.21
11291950
5
DRILL RESERVOIR AND LID AND INSTALL FITTINGS—continued
Reservoir and Lid Preparation
3. Finally, take the reservoir and drill the bulkhead fitting hole using a
2-1/4" hole saw bit
. Review photos and diagrams for position.
ATTENTION:
Use the pump to determine the hole position on the reservoir. Set the pump and reservoir on the same level surface and align the inlet port
of the pump with the spot on the reservoir where the bulkhead fitting will be installed. Mark the location. Adjust as needed to ensure the entire bulkhead
fitting is against the flat surface of the reservoir. Dashed line outlines area for bulkhead fitting.
4. Attach the WF2392 bushing, 111302 extension, and 111303 screen to the threaded body of the bulkhead fitting. Hand tighten until snug.
5. Attach the bulkhead assembly to the reservoir. Hex nut and thin flat washer are outside the reservoir. Tighten until snug using large adjustable pliers.
6. Continue with the next procedure.
WF2392
Bushing
111303
Screen
111302
Install rubber seal
inside reservoir.
Inside reservoir photo
showing fittings.
Sample Reservoir
Identify hole position. Use inlet side of pump
to determine the center of the bulkhead fitting.
REMEMBER:
Entire bulkhead must remain
within the flat surface of the reservoir.
WF8582 Bulkhead
Fitting Installed
Install hex nut
and flat washer
outside reservoir.
Step 3