1.  INTRODUCTION TO THE INSTRUCTION MANUAL

This manual provides the correct procedures and 

requirements for installing E124S and maintaining it 

in a safe condition.
When drafting the manual, the results of the risk 

assessment conducted by FAAC S.p.A. on the entire 

product life cycle have been taken into account in 

order to implement effective risk reduction measures.
The following stages of the life cycle of the product 

have been considered:

 

-

Delivery/handling

 

-

Assembly and installation

 

-

Set-up and commissioning

 

-

Operation

 

-

Maintenance/troubleshooting

 

-

Disposal at the end of the product’s life cycle

Risks arising from installation and using the product 

have been taken into consideration; these include:

 

-

Risks for the installation/maintenance technician 

(technical personnel)

 

-

Risks for the user of the automation system

 

-

Risks to product integrity (damage)

In Europe, the automation of a gate falls under the Ma-

chinery Directive 2006/42/EC and the corresponding 

harmonised standards.  Anyone automating a gate 

(new or existing) is classified as the Manufacturer of the 

Machine.  They are therefore required by law, among 

other things, to carry out a risk analysis of the machine 

(automatic gate in its entirety) and take protective 

measures to fulfil the essential safety requirements 

specified in Annex I of the Machinery Directive.
FAAC S.p.A. recommends that you always comply 

with the EN 12453 standard and in particular that you 

adopt the safety criteria and devices indicated, without 

exception, including the dead-man function.
This manual also contains general information and 

guidelines, which are purely illustrative and not exhau-

stive, in order to facilitate the activities carried out by 

the Manufacturer of the Machine in all respects with 

regard to carrying out the risk analysis and drafting the 

instructions for use and maintenance of the machine. It 

should be clearly understood that FAAC S.p.A. accepts 

no liability for the reliability and/ or completeness of 

the above instructions.  As such, the manufacturer of 

the machine must carry out all the activities required 

by the Machinery Directive and the corresponding 

harmonised standards on the basis of the actual 

condition of the locations and structures where the 

product E124S will be installed, prior to commissioning 

the machine. These activities include the analysis of all 

the risks associated with the machine and subsequent 

implementation of all safety measures intended to 

fulfil the essential safety requirements.
This manual contains references to European stan-

dards.  The automation of a gate must fully comply 

with any laws, standards and regulations applicable in 

the country where installation will take place.

 

L

Unless otherwise specified, the measurements provided 

in the instructions are in mm.

Summary of Contents for E124S

Page 1: ...E124S Translation of the original instructions...

Page 2: ...p A Alle vermelde namen en merken zijn eigendom van de respectievelijke fabrikanten Deklantenmogenkopie nmakendieenkelvooreigengebruikbestemdzijn Dez handleiding werd in 2023 gepubliceerd Copyright F...

Page 3: ...alling the XF FDS or XF radio module 24 7 1 Memorising XF FDS radio controls 24 7 2 Memorising SLH SLH LR radio controls 24 Memorising the first radio control Master 25 Adding SLH SLH LR radio control...

Page 4: ...to fulfil the essential safety requirements specified in Annex I of the Machinery Directive FAAC S p A recommends that you always comply with the EN 12453 standard and in particular that you adoptthes...

Page 5: ...mage to components The operation or stage described must be performed following the supplied instructions and applicable safety regulations i WARNING Details and specifications which must be respected...

Page 6: ...e fore must not be commissioned until the machine in which it has been incorporated has been identified and declared to conform to the Machinery Directive 2006 42 EC by the actual Manufacturer Incorre...

Page 7: ...duct s compo nents Do not install the board unless it is housed in the enclosure supplied by FAAC 3 3 UNAUTHORISED USE Do not use on motors or devices that are intended for purposes other than operati...

Page 8: ...4 Ambient operating temperature 20 55 C TheE124S cancontroloneortwo24V brushedmo tors each having a maximum power of 70 W Enclosure the enclosure houses the E124S and the switching power supply and is...

Page 9: ...oximity to the planned digging drilling locations to prevent the risk of electrocution Check that there are no pipes in the vicinity as well The external electronic board must be housed in an enclosur...

Page 10: ...ried out the preliminary start up checks Never remove the board cover unless the instructions specifically indicate that you should do so Handle the enclosure carefully so as not to damage the board a...

Page 11: ...Reinstall the cover OPENINGTOTHE LEFT FASTEN THE ENCLOSURE 1 5 Remove the 4 screw caps 5 mm holes 2 Markthefixingpointsonthesupport drilltheholes andsecureusingsuitablescrewsanddowels lastly inert the...

Page 12: ...OMPONENTS SWITCHING POWER SUPPLY Theswitchingpowersupplyisfactorysettoanominal mains voltage of 230 V SETTINGTHE MAINSVOLTAGETO 115V If the mains voltage is 115 V the position of the selector has to b...

Page 13: ...device inputs IN1 IN5 and accessories power supply OUT2 Removableterminalboardforprogrammable output FC Removable terminal board for limit switch inputs ENC RemovableterminalboardforGatecoderFAAC inp...

Page 14: ...d photocells sensitive edges 8 24 Accessories power supply NO type inputs normally open Devices with a NO contact must be connected to NO inputs the com mandisactivatedwhenthecontactcloses Multiple NO...

Page 15: ...flashing light to the intermittent output on the LAMP terminal board Functions available in Advanced programming PF pre flashing of 3 s before movement AS scheduled maintenance request further 8 s of...

Page 16: ...fficient range see the device instructions EMERGENCY BATTERIES BATTERY Connect the back up batteries dedicated section in the Accessorieschapter orastabilizedpowersupply top the BATTERY connector LCon...

Page 17: ...ach the last function St 2 Select Y save the changes no DO NOT save the changes 3 Press the button F F to confirm the display reverts to the automation status view RISKS PERSONAL PROTECTIVE EQUIPMENT...

Page 18: ...y step S Automatic Safety SA Automatic Safety 2 SP Automatic step by step A1 Automatic 1 A Automatic AP Automatic step by step At Automaticwithtimer function b Semi automatic b bC Mixed Impulseopen in...

Page 19: ...step 1 s Thedisplaysubsequentlychangestominutesandtensofseconds separated by a point up to a maximum of 1 3 minutes 1 0 1 3 Adjustment step 10 s E g 1 2 1 min and 20 s 05 bu BUS 2easy REGISTRATION See...

Page 20: ...on Leaf 2 it is usually on Leaf 1 Y enabled no disabled no Od LEAF OPENING DELAY NOT displayed if Mn 1 This delay is applied to Leaf 2 00 59 s Adjustment step 1 s The display subsequently changes to m...

Page 21: ...8 This function causestheleaftoreverseslightlyafterthemechanicalstophasbeendetected Y enabled no disabled no o1 OUT1 Function of output OUT1 00 The letters tr indicateTIMER programming from Simply Con...

Page 22: ...cle counter press and for 5 s 00 nd TENS of CYCLES Displays the tens of cycles that have been performed 00 53 if AS no 00 99 programmable if AS Y 00 St LEAVINGTHE PROGRAMMING MODE Y Exit without savin...

Page 23: ...rent phases with a flashing code from S1 to S6 see SETUP phases If the SETUP procedure doesn t start or stops before it has been completed the board exits from program ming mode and S0 flashes on the...

Page 24: ...king the cur rent absorbed by the motor or by using the encoder if present Thefourthconsecutiveobstacle whichisdetected inthesamedirectionandposition isdefinedasthe newmechanicalstopoftheleaf whentheo...

Page 25: ...n impact force tester in accordance with standard EN 12453 For non EU countries if there are no specific local regulations the static forcemustbelessthan150N Ifnecessary adjust the anti crushing syste...

Page 26: ...he display shows the corresponding code after any Errors Alarms that may be present SL compatible with SLH SLH LR LC RC DS radio controls Fd compatible with FDS radio controls Memory full warning If t...

Page 27: ...s timeavailable to repeat step 2 on another radio control The procedure ends after 20 s if no further radio controlsarememorisedandtheRADIOLEDswitches off To add additional radio controls repeat the p...

Page 28: ...NGLISH LED sequence has finished after 1 s the RADIO2 LED starts flashing slowly after 5 s both the RADIO1 and RADIO2 LEDs start to flash quickly deletion in progress after 7 s both LEDs come on stead...

Page 29: ...sy control devices require E124S firmware ver sion FW 3 2 or later 1 Configure the DIP switches on the device to assign 1 o 2 commands DIP switches for BUS 2easy commands IMPORTANT a command e g OPEN...

Page 30: ...the transmitter and receivertospecifythetypeofoperationandassign an identification code to the pair ADDRESS DIP switches for BUS 2easy photocells and sensi tive edges The CLOSING PHOTOCELLS CL FSW pro...

Page 31: ...devices using the specific procedure or via SETUP 8 1 REGISTERING REMOVING BUS 2easy DEVICES The SETUP procedure registers the BUS 2easy devices that are connected Alternatively you can carry out the...

Page 32: ...the GND terminal or to the output programmed as FAIL SAFE if enabled Positionandconnectthephotocellsaccordingtotheir required use CL CLOSINGPHOTOCELLS Activeduringclosureintheir detection area OP OPEN...

Page 33: ...ised persons present for the entire duration of operations carried out remotely activations SETUP and or modi fications to operating parameters LSimply Connect requires E124S firmware version FW 4 0 o...

Page 34: ...w water to get into the enclosure 2 Insert the support and rest the batteries on it 3 Connect the cables supplied to the battery termi nals following the polarity shown 4 Makesurethatthemainpowerconne...

Page 35: ...d photocells engaged FCA1 DL6 Opening limit switch not engaged engaged FCC1 DL7 Closing limit switch not engaged engaged FCA2 DL8 Opening limit switch not engaged engaged FCC2 DL9 Closing limit switch...

Page 36: ...he motor connection IMPORTANT Iftheautomationhas2leaves endthetestwiththe leaves positioned so there is no interference between them BUS 2easy STATUS To check the BUS 2easy connection look at the 2EAS...

Page 37: ...63 Intrusionattemptin progress An attempt to open the leaf manually hasbeendetected Startamovement 65 SETUP in progress SETUPisinprogress Thenotificationre mainsaslongasthephaseisinprogress 67 i Low e...

Page 38: ...nnect 82 Opening sensitive edge disabled The opening sensitive edges have been disabled via Simply Connect 83 Closing sensitive edges disabled The closing sensitive edges have been disabled via Simply...

Page 39: ...ard protection covers Check that the connectors and wiring are intact Check that there are no signs of overheating burning etc of electronic components Check that the earth connections are intact and...

Page 40: ...NCED programming function AS se lect Y to enable the maintenance request 2 In function nc set the value in thousands using the and buttons 3 In function nd set the value in tens using the and buttons...

Page 41: ...board The display shows bo 2 The FW update starts automatically Thedisplayshowsthepercentageofprogress 00 99 and lastly shows 2 alternating dashes 3 To exit the procedure with the power supply switch...

Page 42: ...utomatically after the pause time has elapsed COMMANDS OPEN A Total motion Total motion is 100 of the length of travel In 2 leaf automations Leaf1 starts opening first if the delay is programmed OPEN...

Page 43: ...automation closes automatically after the pause time has elapsed OPEN during the pause resets the pause time OPEN during opening is ignored OPEN during closing causes it to reopen The triggering of t...

Page 44: ...ined commands OPEN A OPEN to open and OPEN B CLOSE to close Partial motion is not available A maintained command must be activated intentionally and the automation must be visible Maintained OPEN open...

Page 45: ...Y Tel 39 051 61724 Fax 39 051 09 57 820 www faac it www faactechnologies com Cet appareil se recycle OU FR D POSER EN MAGASIN D POSER EN D CH TERIE Points de collecte sur www quefairedemesdechets fr P...

Reviews: