A1400 AIR
29
532129 04 - Rev.B
23
24
3
3
3
2
4
1
5
5
3
4
2
1
25
Tr
ansla
tion of the original instruc
tions
ENGLISH
9. Adjust the distance between the leaf profile and balancing profile
using the grub screws on the profile
23
-
. This adjustment
corrects any flaws on the wall surface.
10. Check proper vertical and horizontal alignment.
11. Fasten the fixed leaf sides as shown in
23
-
.
!
If the balancing profile needs to be cut, pay attention to the alignment
of the holes, which have a variable spacing. It is recommended to make
the reference marks for the cut starting from the top.
FASTENING THE FIXED LEAVES
Fixed leaves may be:
-
with low skirting
-
with high skirting
Fasten the fixed leaf to the floor by drilling the leaf
24
-
and fasten
it using suitable screws and dowels.
-
Use adequate wall bits and dowels with screws.
!
Ensure there are no hydraulic coils or electrical conduits under the floor
at the planned drill points.
MOUNTING MOBILE LEAVES
Mount the leaves as described in § 9
34
.
GLAZING INSTALLATION
1. Place the 3 shims in the lower part of the profile
24
-
.
2. Place the glazing on the shims.
25
-
!
Handle the glazing adhering to the safety warnings in the Safety chapter.
3. Secure the glass using the beading supplied
25
-
.
4. Insert the beading along the entire length of the perimeter.
!
The seal must be inserted with the spline side towards the inside of the
profile
25
-
.
ASSEMBLY OF THE HEAD SECTION TO THE UPPER
PROFILE
Mount the assembled head section onto the upper profile by means
of suitable attachments.
After mounting the head section, perform all procedures to secure the
leaf to the carriages as set out in the chapters concerning kit assembly.
Refer to chapter § 8 also for all the adjustment procedures.
7.2 ENTRY DOOR WITH TK20 PROFILES
PRELIMINARY OPERATIONS
1. Check soundness of the installation opening (Masonry, Structural
Metal Work, etc.).
2. Take the measurements of the opening.
!
The frame must be fastened to the structure with suitable attachments.
Ensure there are no hydraulic coils or electrical conduits under the floor
at the planned drill points.
3. Measure the door frame and compare them with the opening
measurements.
4. Check floor levelness with a spirit level.
Summary of Contents for A1400 AIR
Page 1: ...A1400 AIR A1400 AIR DM EN16005 2012 E1SL fw 3 0 SDK EVO fw 30 LK EVO fw 1 2...
Page 122: ......
Page 124: ...A1400 AIR 124 53212904 Rev B...
Page 128: ...A1400 AIR 128 53212904 Rev B...
Page 129: ...A1400 AIR 129 53212904 Rev B...