Cable Cubby
®
Products • Installation
Installaton, cont’d
2-8
Installng the power module (CC 300, 600, and 800)
From the underside of the Cable Cubby, gently push the power
module into the desired position at the desired elevation. Secure
the power module into position with four Phillips head screws.
Installng the cables
Three half-moon cutouts in each set of cable pass-through (split)
AAPs loosely channel three cables in the cubby. Each channel
is padded with a split grommet to prevent cable wear. Each
channel and each associated split grommet is a different size
(figure 2-5).
Large
Medium
Small
Large
Medium
Small
Large
Medium
Small
Cable hole
Hole size
Grommet size
Large
0.625" (1.59 cm)
0.453" (1.15 cm)
Medium
0.562" (1.43 cm)
0.390" (0.99 cm)
Small
0.5" (1.27 cm)
0.312" (0.79 cm)
Figure 2-5 — Cable pass-through AAPs
A typical installation consists of a VGA cable, an audio cable,
and a network cable. In a typical installation, the VGA cable
runs in the largest channel, the network cable runs in the middle
(medium) channel, and the audio cable runs in the smaller
channel. In a non-standard installation, just match the diameter
of the cable to the size of the channel as best you can.