Operation, cont’d
Fiber Matrix 6400 Switcher • Operation
3-36
Worksheet example 3: Test configuration
The A/V system in our fictional organization needs to be fine tuned on a regular
basis. Figure 3-7 shows a typical test configuration, with an Extron video test
generator (input 12) generating a test pattern to all monitors (outputs 1, 2, 3, 4, 8,
9, 10, 11, and 12) and to the various wall boxes. Sound checks are run from the CD
player (input 5) to all audio systems (outputs 1, 2, 3, 4, 5, and 8).
Summary of Contents for 6400s
Page 1: ...Fiber Matrix 6400 Configurable Fiber Optic Digital Matrix Switcher 68 1371 01 Rev B 06 08...
Page 4: ......
Page 10: ...Table of Contents cont d Fiber Matrix 6400 Switcher Table of Contents vi...
Page 64: ...Operation cont d Fiber Matrix 6400 Switcher Operation 3 38...
Page 66: ...Operation cont d Fiber Matrix 6400 Switcher Operation 3 40...
Page 86: ...Programmer s Guide cont d Fiber Matrix 6400 Switcher Programmer s Guide 4 20...
Page 112: ...Matrix Software cont d Fiber Matrix 6400 Switcher Matrix Software 5 26...
Page 131: ...7 7 Fiber Matrix 6400 Switcher Maintenance and Modifications Button label blanks...
Page 133: ...Fiber Matrix 6400 Switcher A Appendix A Ethernet Connection Ethernet Link Subnetting A Primer...
Page 140: ...Ethernet Connection cont d Fiber Matrix 6400 Switcher Ethernet Connection A 8...