Operation, cont’d
Fiber Matrix 6400 Switcher • Operation
3-34
Worksheet example 2: Daily configuration
Figure 3-6 continues from worksheet example 1 by showing the video and audio
ties that make up the configuration of preset 1. Solid lines shows video ties and
dashed lines show the audio ties.
In this example:
• The image of the presenter, from the main podium camera (input 1), is:
Displayed in the main hall (output 1)
Displayed in the conference room (output 4) to the overflow crowd
Displayed in the lobby (output 8)
Tied to the VCR (output 6)
• The presenter has a presentation on her laptop computer (input 4) that is:
Displayed in the main hall (output 2)
Displayed locally on the podium (output 3)
• The audio from the presenter’s microphone (input 3) is:
Played in the hall (output 1)
Played in the conference room (output 4)
Sent to the VCR (output 6)
• Music from the CD player (input 5) is:
Played in the background in the main hall on sound system #2 (output 5)
Played in the lobby (output 8)
Summary of Contents for 6400s
Page 1: ...Fiber Matrix 6400 Configurable Fiber Optic Digital Matrix Switcher 68 1371 01 Rev B 06 08...
Page 4: ......
Page 10: ...Table of Contents cont d Fiber Matrix 6400 Switcher Table of Contents vi...
Page 64: ...Operation cont d Fiber Matrix 6400 Switcher Operation 3 38...
Page 66: ...Operation cont d Fiber Matrix 6400 Switcher Operation 3 40...
Page 86: ...Programmer s Guide cont d Fiber Matrix 6400 Switcher Programmer s Guide 4 20...
Page 112: ...Matrix Software cont d Fiber Matrix 6400 Switcher Matrix Software 5 26...
Page 131: ...7 7 Fiber Matrix 6400 Switcher Maintenance and Modifications Button label blanks...
Page 133: ...Fiber Matrix 6400 Switcher A Appendix A Ethernet Connection Ethernet Link Subnetting A Primer...
Page 140: ...Ethernet Connection cont d Fiber Matrix 6400 Switcher Ethernet Connection A 8...