CHAPTER 61
PAGE 7
MAINTENANCE MANUAL EXTRA 300/SC
PAGE DATE: 12. February 2019
clamp sheets and contained plastic guidance from the en-
gine baffle.
10
Remove 2 bolts of the clamp sheet attachment positioned
at the firewall break through (10). Disconnect clamp sheet
and contained plastic guidance from the rear side of the
firewall.
11
Mark vernier control cable routing and remove the self-
clinching plastic tiedown straps in the cabin area.
12
Remove attachment nut (9) and washer of the vernier con-
trol unit (7).
13
To remove vernier control unit from its bracket, pull the
unit slightly aft (about 15cm [0.5ft]) and then to the RH in-
side direction.
14
Pull complete vernier control cable (6) aft to remove from
aircraft. Secure clamp sheets.
Installation
Install in reverse sequence of removal observing the follow-
ing items:
1
Thread the respective clamp sheets and plastic guidance on
the vernier control cable before penetrating the firewall and
the rear engine baffle.
2
Install rod end to the vernier control cable terminal. Ensure
thread of control cable terminal is visible in the inspection
hole.
3
Renew the firewall sealing of the firewall break through at
the engine side of the firewall as per Chapter 20.
4
Tighten the castle nut slightly. Ensure movability of gover-
nor control lever (2).
Rigging
1
Move vernier control knob (8, Figure 2) to the foremost
position.
2
Check that the travel stop at the governor control lever is
reached, and the over-travel of 5mm [3/16"] (tol/-1
Summary of Contents for 300/SC
Page 96: ...CHAPTER 28 PAGE 5 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 1 Fuel System...
Page 100: ...CHAPTER 28 PAGE 9 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 2 Storage...
Page 122: ...CHAPTER 28 PAGE 31 MAINTENANCEMANUAL EXTRA300 SC PAGEDATE 12 February2019 Figure 14 Indicating...
Page 138: ...CHAPTER 32 PAGE 12 PAGEDATE 12 February2019 MAINTENANCEMANUALEXTRA300 SC Figure 6 Brake System...
Page 228: ......
Page 229: ......