WorkForce 1100/Epson Stylus Office T1110/B1100/T1100/Epson ME Office 1100
Revision C
Disassembly And Assembly
Disassembling the Printer Mechanism
99
Confidential
4.4.7 LD Roller
1.
Remove the ASF Assy. (p.96)
2.
Remove the ASF Motor. (p.123)
3. Remove the Combination Gear 29,11 from the ASF Assy.
4. Release the tab that secure the LD Spur Gear, and remove the LD Spur Gear from
the LD Roller Shaft.
Figure 4-88. Removing the LD Roller (1)
A D J U S T M E N T
R E Q U I R E D
After replacing or removing the ASF Assy, always make the required
adjustments referring to the following.
“Chapter 5
Adjustment
(p.128)
”
C H E C K
P O I N T
When replacing the LD Roller, replace the Retard Roller Assy
together with the LD Roller.
(Refer to 4.4.8 Retard Roller Assy
(p.101).)
Combination Gear 29.11
LD Spur Gear
Tab
Summary of Contents for WorkForce 1100
Page 8: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Page 21: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Page 29: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Page 61: ...Confidential C H A P T E R 4 DISASSEMBLYANDASSEMBLY ...
Page 128: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Page 152: ...Confidential C H A P T E R 6 MAINTENANCE ...