EPSON Stylus PHOTO 895/785EPX
Revision A
Disassembly and Assembly
Disassembly
87
A D J U S T M E N T
R E Q U I R E D
When replacing the Main board with a new one, perform the
following service items.
Replace the both ink cartridges with a brand new one.
Replace the Waste ink drain pad with a new one.
Write the initial setting value.
Input the Printhead ID.
Adjust the Bi-d alignment.
Write USB-ID.
Confirm the memory card drive.
Tightening Torque for screw
• C.B.S 3x6 F/ZN screw for Board cover
: 6+/- 1kgf.cm
• C.B.S 3x6 F/ZN screw for Panel shield plate:
: 6+/- 1kgf.cm
• C.B.S 3x6 F/ZN screw for Main board
: 6+/- 1kgf.cm
• C.P 3x6 F/ZN screw for USB interface, preview monitor
:
3.5+/- 1kgf.cm
• C.B.S 3x6 F/ZN screw for PSE board
: 6+/- 1kgf.cm
• C.F.S-TITE 3x8, F/ZN screw for AC120V cable
: 6+/- 1kgf.cm
• C.B.(O) 4x5 F/ZG screw for Earth cable
: 11+/-1kgf.cm
When reassembling the main board tighten screws from lower
numbers in Figure 4-22. "Board cover removal".
When reassembling the main board and the circuit board,
tighten screws from lower numbers in Figure 4-24. "Remove the
screw securing each circuit board".
C H E C K
P O I N T
Check the Earth terminal and wire position. Refer to the following
figure. The earth wire for 120V must be placed back side of the
Heat sinker HT1. Be sure to leave at least 2.5 mm of space between
heat sink HT1 and the wire. If this is not possible, secure the wire
with tape or other method to be sure that a minimum of 2.5 mm
spacing is preserved.And the earth wire for 220V must be placed
in front of the Heat sinker HT1 as following figure
Figure 4-25. Earth terminal and wire position
120V type
Earth terminal
2.5mm
Heat sinker
Earth terminal
Heat sinker
220V type