50
Installation and Operating Instructions - EOS Herkules XL S120
Commissioning
EN
2
WARNING! Stones that are stacked too closely prevent the hot air from
rising properly, thus causing the unit to overheat. The result is a risk of
fire.
Stack the stones loosely in the rock store, leaving sufficient space be-
tween them. Stack the stones individually.
There must be enough space between the stones so that convection
air can circulate sufficiently between them.
Fill the store with stones only to the upper edge.
5.2 Starting the heater
A slight odour may be produced the first time the cabin is heated because
the heater is being heated for the first time. The odour ceases upon contin-
ued operation of the heater.
Switching the system on
1
Switch the sauna control unit on.
The heater is switched on via the control unit.
2
Use the control unit to select a suitable program.
5.3 Commissioning by remote control
If you switch on the heater using the remote control, ensure that no
objects are placed on the heater. A suitable safety device (e.g. EOSafe D/L)
can be used to prevent this.