
Environnement
S.A
AF22e
Duplication prohibited
APRIL 2016
4–12
MAINTENANCE SHEET
MONITOR Serial No.:
OPERATION SHEET: 4.3.4
Scope: KNF pump maintenance
PAGE: 4/5
Frequency: 1 year
Valves (22) and O-rings (23) replacement:
The valves are located in the cylinder head. Replace the valves (22) and the O-rings (23), taking care
to correctly
fit together the O-rings in their housings.
(22) valves, (23) O-rings.
Figure 4–5 – Valves and O-rings replacement
Date
Tools and parts required
•
Two flat screwdrivers, 1 x 5.5 cm and 0.4 x 2.5 cm
•
Hexagon socket head wrench, n°3
•
KNF pump maintenance kit. Ref.: V04-0005
•
Cross-tip screwdriver, 4.5 x 75 cm
Summary of Contents for AF22e
Page 20: ...EnvironnementS A AF22e Duplication prohibited APRIL 2016 1 12 Page intentionally left blank...
Page 22: ...EnvironnementS A AF22e Duplication prohibited APRIL 2016 2 2 Page intentionally left blank...
Page 76: ...EnvironnementS A AF22e Duplication prohibited APRIL 2016 3 42...
Page 82: ...EnvironnementS A AF22e Duplication prohibited APRIL 2016 4 2 Page intentionally left blank...
Page 98: ...EnvironnementS A AF22e Duplication prohibited APRIL 2016 4 18 Page intentionally left blank...
Page 100: ...EnvironnementS A AF22e Duplication prohibited APRIL 2016 5 2 Page intentionally left blank...
Page 107: ...Duplication prohibited AF22e EnvironnementS A APRIL 2016 5 9 Page intentionally left blank...
Page 118: ...EnvironnementS A AF22e Duplication prohibited JUNE 2016 5 20 Page intentionally left blank...