Enterasys X-Pedition 8000/8600 Getting Started Guide
55
Installing the Hardware
Installing the Hardware
This section describes how to perform the following tasks:
•
Check the shipping box to ensure that all the parts arrived
•
Install the chassis (on a tabletop or in an equipment rack)
•
Install the control module
•
Install a memory upgrade
•
Install the switching fabric module (X-Pedition 8600 only)
•
Install line cards
•
Install the power supply (either AC or DC)
•
Attach console management cables
•
Attach port cables
Verifying Your Shipment
Before you begin installing your X-Pedition, check your shipment to ensure that everything you
ordered arrived securely.
Caution
: To avoid back strain, be careful when lifting the chassis out of the shipping box.
Open the shipping box(es) and verify that you received the following equipment:
•
An X-Pedition 8000 or X-Pedition 8600 chassis containing a backplane, fan module, and a
console cable. The console cable is used for connecting a terminal to the control module DB-9
port.
•
An X-Pedition 8000 or X-Pedition 8600 power supply.
•
One country-specific power cable per power supply.
•
One control module.
•
One Switching Fabric Module (X-Pedition 8600 only).
•
An X-Pedition Media Kit containing:
–
One PCMCIA flash card containing the X-Pedition system software
–
One copy of the Enterasys X-Pedition 8000/8600 Getting Started Guide (the book you are
reading now)
–
Release Notes
Summary of Contents for 8000/8600
Page 1: ...Getting Started Guide Revision Date 11 27 2002 8000 8600 9032552 16...
Page 8: ...vi Enterasys X Pedition 8000 8600 Getting Started Guide...
Page 116: ...104 Enterasys X Pedition 8000 8600 Getting Started Guide...
Page 142: ...Index 130 Enterasys X Pedition 8000 8600 Getting Started Guide...