Enterasys X-Pedition 8000/8600 Getting Started Guide
59
Installing the Hardware
The following table lists the environmental specifications for the X-Pedition’s AC power supplies.
Figure 24
shows an example of how to install an AC power supply. The procedure following the
figure describes how to do this.
Figure 24. Installing an AC power supply
AC Power Supply Installation Procedure
To install an AC power supply:
1.
Ensure that the AC power supply is not powered on.
2.
If a coverplate is installed over the power supply slot, use the #2 Phillips screwdriver to remove
it. If you are replacing an AC power supply, unplug the power cable from the supply you are
replacing, loosen the captive screws on the power supply’s front panel, then pull the supply out
of the chassis.
3.
Slide the AC power supply all the way into the slot, firmly but gently pressing to ensure that
the pins on the back of the power supply are completely seated in the backplane.
Operating Temperature
+5 to +40 °C (41 to 104 °F)
Non-operating Temperature
-30 to +73 °C (-22 to 164 °F)
Operating Humidity
15 to 90% (non-condensing)
SSR-8
SSR-PS-8
100-125~5A
200-240~3A
50-60 Hz
PWR
Summary of Contents for 8000/8600
Page 1: ...Getting Started Guide Revision Date 11 27 2002 8000 8600 9032552 16...
Page 8: ...vi Enterasys X Pedition 8000 8600 Getting Started Guide...
Page 116: ...104 Enterasys X Pedition 8000 8600 Getting Started Guide...
Page 142: ...Index 130 Enterasys X Pedition 8000 8600 Getting Started Guide...