Enterasys X-Pedition 8000/8600 Getting Started Guide
57
Installing the Hardware
Rack Mount Installation
You can install the X-Pedition in a standard 19-inch equipment rack. The X-Pedition chassis is
equipped with front-mounting brackets.
Figure 23
shows an example of how to install an
X-Pedition 8600 chassis in an equipment rack.
Figure 23. Installing the X-Pedition 8600 chassis in an equipment rack
Note:
Never attempt to rack mount the X-Pedition chassis unaided. Ask an assistant to help you
hold the chassis.
Caution
: To make lifting and holding the chassis easier, install the chassis before you install line
cards or redundant control modules and power supplies.
To install the X-Pedition chassis in an equipment rack, use the following procedure. You need a #2
Phillips screwdriver to perform this procedure.
1.
If the front-mounting brackets are already installed on the X-Pedition chassis, go to
step 2
. If
not, do the following:
a.
Align one of the mounting brackets over the corresponding holes in the side of the chassis.
The mounting bracket is correctly positioned when the side with two open mounting holes
is flush with the front of the chassis.
b.
Use the #2 Phillips screwdriver and two of the supplied Phillips screws to attach the
mounting bracket to the chassis.
c.
Attach the other mounting bracket.
SSR-8
Summary of Contents for 8000/8600
Page 1: ...Getting Started Guide Revision Date 11 27 2002 8000 8600 9032552 16...
Page 8: ...vi Enterasys X Pedition 8000 8600 Getting Started Guide...
Page 116: ...104 Enterasys X Pedition 8000 8600 Getting Started Guide...
Page 142: ...Index 130 Enterasys X Pedition 8000 8600 Getting Started Guide...