7.7. Move the load in transversal direction
For moving the load in transversal direction the moving capability of the side shift is applied.
To operate the side shifts simultaneously, proceed as follows:
1. Apply the RCC
2. Verify that all checklists have been completed and
signed off:
x
Appendix
A
“
Checklist for planning a lifting
operation
”
x
Appendix
B
“
Checklist for installing the
System
”
x
Appendix
C
”
Final checks
”
.
3. Verify the power status of the battery [F]; see the
figure below.
4.
Enable all units; use the buttons [4] “Ram select”.
5. Use [
9] “side shift” to move the selected side shift
units simultaneously.
Summary of Contents for SBL1100
Page 134: ...Document number ED 03622 00 001 R04 ENG Page 134 of 151 ED 02518 00 001 R08 ENG Page 134 ...
Page 136: ...Document number ED 03622 00 001 R04 ENG Page 136 of 151 ED 02518 00 001 R08 ENG Page 136 ...
Page 138: ...Document number ED 03622 00 001 R04 ENG Page 138 of 151 ED 02518 00 001 R08 ENG Page 138 ...
Page 141: ...Document number ED 03622 00 001 R04 ENG Page 141 of 151 ED 02518 00 001 R08 ENG Page 141 ...
Page 142: ...Document number ED 03622 00 001 R04 ENG Page 142 of 151 ED 02518 00 001 R08 ENG Page 142 ...
Page 143: ...Document number ED 03622 00 001 R04 ENG Page 143 of 151 ED 02518 00 001 R08 ENG Page 143 ...
Page 145: ...Document number ED 03622 00 001 R04 ENG Page 145 of 151 ED 02518 00 001 R08 ENG Page 145 ...
Page 146: ...Document number ED 03622 00 001 R04 ENG Page 146 of 151 ED 02518 00 001 R08 ENG Page 146 ...
Page 147: ...Document number ED 03622 00 001 R04 ENG Page 147 of 151 ED 02518 00 001 R08 ENG Page 147 ...
Page 148: ...Document number ED 03622 00 001 R04 ENG Page 148 of 151 ED 02518 00 001 R08 ENG Page 148 ...
Page 149: ...Document number ED 03622 00 001 R04 ENG Page 149 of 151 ED 02518 00 001 R08 ENG Page 149 ...