5.9. Mount the longitudinal beams
When you apply longitudinal beams, make sure those longitudinal beams are securely
fastened to the header beams.
For header beam configurations reference is made to section 3.3.1 Header beam
configurations
”.
)
Enerpac provides a solution for mounting longitudinal beams.
Contact Enerpac if you want to apply longitudinal beams
5.10. Check the stroke sensor
Though the wire of the stroke sensor is not a removable part, its presence and the correct
mounting has to be checked due to its vulnerability.
Proceed as follows:
1. Verify that the wire is connected to the
strip on top of the boom
2. Verify that the wire is attached to the
electrical box and follows the guiding
wheels in as indicated.
Summary of Contents for SBL1100
Page 134: ...Document number ED 03622 00 001 R04 ENG Page 134 of 151 ED 02518 00 001 R08 ENG Page 134 ...
Page 136: ...Document number ED 03622 00 001 R04 ENG Page 136 of 151 ED 02518 00 001 R08 ENG Page 136 ...
Page 138: ...Document number ED 03622 00 001 R04 ENG Page 138 of 151 ED 02518 00 001 R08 ENG Page 138 ...
Page 141: ...Document number ED 03622 00 001 R04 ENG Page 141 of 151 ED 02518 00 001 R08 ENG Page 141 ...
Page 142: ...Document number ED 03622 00 001 R04 ENG Page 142 of 151 ED 02518 00 001 R08 ENG Page 142 ...
Page 143: ...Document number ED 03622 00 001 R04 ENG Page 143 of 151 ED 02518 00 001 R08 ENG Page 143 ...
Page 145: ...Document number ED 03622 00 001 R04 ENG Page 145 of 151 ED 02518 00 001 R08 ENG Page 145 ...
Page 146: ...Document number ED 03622 00 001 R04 ENG Page 146 of 151 ED 02518 00 001 R08 ENG Page 146 ...
Page 147: ...Document number ED 03622 00 001 R04 ENG Page 147 of 151 ED 02518 00 001 R08 ENG Page 147 ...
Page 148: ...Document number ED 03622 00 001 R04 ENG Page 148 of 151 ED 02518 00 001 R08 ENG Page 148 ...
Page 149: ...Document number ED 03622 00 001 R04 ENG Page 149 of 151 ED 02518 00 001 R08 ENG Page 149 ...