
4. Installation of Furnace Components
With the cabinet in place, you are ready to attach the blower assembly, the burner assembly,
and the preheater. Then, you will install the fuel tubing from the pump to the preheater.
4.1 Blower Assembly Installation
The blower assembly provides warm air from the heat exchanger to the room. The blower is
installed on the end of the furnace cabinet. The procedure for installing the blower is as
follows:
1. Locate the side of the blower with the shipping strap or cardboard support, and remove
the wire guard (if installed) on that side.
2. Remove the shipping strap or cardboard support.
3.
Spin the blower wheel by hand to ensure that it spins freely.
4. Align the three loops in the wire guard over the holes in the blower side panel. For 140
and 200 model blowers, insert a rubber washer under each loop. Attached the wire
guard securely using three (3) sheet metal screws.
Screw
Screws
Wire guard installation.
Remove shipping strap or cardboard support and check wheel.
Remove Shipping Strap or
Cardboard Support
Spin Wheel Freely
20
Call 1-615-471-5290 for Technical Support
Summary of Contents for EL-140H
Page 2: ......
Page 51: ...45 Call 1 615 471 5290 for Technical Support ...
Page 90: ...10 2 Carlin 50200E Primary Control 84 Call 1 615 471 5290 for Technical Support ...
Page 91: ...85 Call 1 615 471 5290 for Technical Support ...
Page 93: ...87 Call 1 615 471 5290 for Technical Support ...
Page 94: ...88 Call 1 615 471 5290 for Technical Support ...
Page 95: ...89 Call 1 615 471 5290 for Technical Support ...