Quick Start Guide
- 5 -
Fill with water to static level
Continue fill of
Crushed aggregate
material approximately
3/4" size rock,
pea gravel or sand
6. Replace cover(s) and backfill
Replace cover(s) and protect with cardboard or similar
during back filling. Backfill per specification (See Page 8).
If installing Remote Pump option do so now (See Page 13)
5. Fill tank
Fill tank with water to static water level. This provides stability
and crush resistance during backfilling. Check connections made
for any leaks.
For inspection testing DO NOT PRESSURE the tank. Plug
lines inside interceptor to test upstream and downstream
integrity.
7. Riser Extensions (optional)
Depending on your application, extend the tank risers
(using 40100AX35) to grade/floor level. Be sure to account
for finishing. (Refer to Manual 40100X35-8 – Riser Extension
Installation Guide)
8. Finish to grade / floor
For in ground applications with vehicular traffic, the upper 8” requires a
reinforced concrete slab. Refer to the Installation Specification section of
this document (See Page 8-9). This details backfill materials and concrete
reinforcement requirements.
If installing in internal application with tiled floor, ensure adequate
protection to prevent mortar from covering bolts, and/or entering
around cover perimeter.
9. Completion documentation
Having completed installation and successful inspection, hand-over to the client all installation documentation, with page 14
completed. Fill out your sections of the Limited Lifetime warranty registration (See Page 24).
If submitting on behalf of your client you can do so at www.EnduraWarranty.com or by sending to the locations shown on
the back cover of this document.
72”
Maximum
height
Reinforced concrete pad for traffic rated installations
8"
WARNING!
X
DO NOT
PRESSURE TEST.
RISK OF SERIOUS
INJURY.
For Spec See Page 8-9