Operation

Operation

IMPORTANT:

Dynamic 

Interceptor is uniquely accessible once in service. 
Having removed the cover above the inlet, a simple 
pull/push motion on the handle opens and closes 
the front shell, allowing access for maintenance and 
cleaning. This action also opens the inlet drain to 
its full diameter allowing the upstream drains to be 
cleaned without obstruction.

and value even when buried at full depth below 
grade. Refer to installation instructions for riser 
extension.

Food Solids and Debris:

Solids 

retention 

area

Accessibility:

It is the responsibility of the restaurant operator to maintain 
safe, clear and unobstructed access to the interceptor at all 

access in the event of an issue and for the regular pumping of 
the interceptor required to keep it in good working order.

Pull up
to open

Visually inspect 
or clean inlet and 

required 

 

 

WARNING – SAFETY FIRST!

GREASE INTERCEPTORS ARE HAZARDOUS 
ENVIRONMENTS AND MUST NEVER BE LEFT UNCOVERED 
AND UNATTENDED, EVEN DURING MAINTENANCE.

 

• All access covers MUST be fully and completely secured
• All required bolts MUST at all times be in place and well tightened
• Missing bolts MUST be reported to management and replaced immediately
• 

• 

Covers MUST meet the required load rating for the application (see the  

  Technical Information section)  

Do NOT use alternate covers

 

WARNING – SAFETY FIRST!

ENSURE THAT ANY OPERATIVES OR EMPLOYEES THAT 
ATTEND TO THE GREASE INTERCEPTOR ARE ADEQUATELY 
PROTECTED. AS A MINIMUM IT IS RECOMMENDED THAT 
PROTECTIVE GLOVES, EYEWEAR AND A MASK ARE 
PROVIDED AND USED.

Clearance

Min.  3ft

180˚

Min.  7ft

clearance

- 15 -

Endura® XL is designed to manage up to 15% of its volume for solids management. Remember 
however that your grease interceptor is an engineered system that is not designed to 
accommodate large amounts of solid material. This will impact the operational capacity and 
performance of the unit and cause the foul odors often associated with grease interceptors if not 
removed regularly.

It is strongly recommended that a solids interceptor be installed upstream of the grease interceptor and that all entry points to the drains 

kitchen practice recommends that all plates, crockery, pans, etc., be scraped to remove lose food debris prior to washing. Again sinks should be 
operated with the respective screens.

 
If you are experiencing frequent issues in regard to blockages or accumulation in your interceptor you must address the appropriate kitchen 
practices. DO NOT MODIFY THE INTERCEPTOR OR MEANS OF FLOW CONTROL IN ANY MANNER. Doing so voids the performance approval 

Summary of Contents for 40100A04

Page 1: ...appurtenance your Endura grease interceptor MUST be isolated from the drainage system in the event that nal drain testing or other system pressure testing is required DO NOT under any circumstances s...

Page 2: ...latest addition to the proven line of Endura Grease Management products We have spent many thousands of hours in the development of Endura XL our aim being simple to produce the industry s best Hydrom...

Page 3: ...heck review building plumbing pretreatment sewer and waste water Bottom line those who enforce the rules and regulations Cost Index A way of indicating the relative cost of different types of intercep...

Page 4: ...mum safety factor of 2 shall be applied in calculation design Concrete Anchor Base if anchoring is required Min 6 Inle O t utlet Min 12 Min 12 Min 8 6 Minimum Base of Crushed aggregate material approx...

Page 5: ...Extension Installation Guide 8 Finish to grade floor For in ground applications with vehicular traffic the upper 8 requires a reinforced concrete slab Refer to the Installation Specification section o...

Page 6: ...150 gpm tank 4 Spigot connections with S Rated Lids 1 40150A04 Endura XL 150 gpm tank 4 Spigot connections with M Rated Lids 1 40150A04M Endura XL 150 gpm tank 4 Threaded connections with S Rated Lid...

Page 7: ...hall additionally operate with an air balanced environment to equalize variation in internal pressures being controlled and maintained with an appropriately sized air balance means be supported by a L...

Page 8: ...ongitudinally 1 6 anchoring may however be necessary as determined by the specifying engineer Tie down locations are incorporated to the tank and can be used in conjunction with coated stainless steel...

Page 9: ...y specifying engineer 2 BACKFILLING FINISHED CONCRETE SLAB TRAFFIC LOAD RATED AASHTO 304 H20 16 000lbs and approved to CSA B481 0 Class S 20 F to 100 F 29 C to 38 C 2 1 Preparation of sub grade per lo...

Page 10: ...ol If Required External Flow Control If Required GR N I E S A E R E T C P E T R O GR N I E S A E E T RC P E T R O GREA N I E S R E T C P E T R O GR N I E S A E R E T C P E T R O Endura XL grease inter...

Page 11: ...criterial are met See Page 12 Trapping equivalent in compliance with applicable plumbing code requirements Venting The installation of the interceptor shall be vented downstream in accordance with lo...

Page 12: ...main drain line connected to the interceptor The remain accessible for maintenance and The location of the cleanout should be recorded in you Installer Hand Over Check List See Page 14 is important th...

Page 13: ...enetration tank seal Part 40100 TPS into the opening prepared and lubricate well using silicone pipe lubricant 6 As the orientation of the pipe when installed is important mark or identify on the top...

Page 14: ..._______ Connections Cleanouts Mark where installed Extension Risers added Yes if Yes approx length of riser installed _________in m No Flow Control Handle Extended Yes No See Riser Extension Instructi...

Page 15: ...place and well tightened MissingboltsMUSTbereportedtomanagementandreplacedimmediately Covers MUST meet the required load rating for the application see the Technical Information section Do NOT use alt...

Page 16: ...ght sampling air balance cap must be raised also Air Balance Hole Maintenance IMPORTANT Regular Removal of Fat Oil and Grease Due to the capacity of your Endura XL Grease Interceptor it is necessary t...

Page 17: ...of damage to the internal flow control where fitted by rooting or other equipment Access to the Outlet Well Although essentially a closed area the outlet system is able to be accessed by removal of th...

Page 18: ...olume of Waste Removed _____________________ Gallons Liters Inlet Baffle Opened Inspected Yes No Flow Control Checked Cleaned Yes No Note The flow control device internal or external shall be inspecte...

Page 19: ...equency I think I have missing parts Parts have been removed or lost during prior servicing Check exploded drawing in this manual to confirm the parts that are supposed to make up your interceptor mod...

Page 20: ...Load Drainage Period 70 84 1 min 70 84 l p m 70 84 2 min 35 42 l p m 5 Select Interceptor falls between two sizes select the larger of the two interceptors For a one minute drainage period For a two m...

Page 21: ...ivalent is not directly achievable by application of a standard formula As an experienced manufacturer in the Grease Management market we have been able to identify and validate a a manufacturers reco...

Page 22: ...nce will be proportionally less too Rates will vary significantly by region and by contractor Always use a licensed or approved contractor to maintain your interceptor Do Endura XL tanks need to be di...

Page 23: ...th the Products or on Manufacturer s website ii the Products have been installed and used in strict compliance with Manufacturer s written instructions as published and updated from time to time by Ma...

Page 24: ...Email us feedback endurainterceptor com Limited LifetimeWarranty Registration Card Congratulations on your purchase of the Endura XL Grease Interceptor This product is supplied with a the manufacturer...

Reviews: