Endura 40100A04 Installation Operation & Maintenance Download Page 10

- 10 -

Exter

n

al 

Flow Contr

ol

If Requi

red

Exter

n

al 

Flow Contr

ol

If Requi

red

Exter

n

al 

Flow Contr

ol

If Requi

red

Exter

n

al 

Flow Contr

ol

If Requi

red

Exter

n

al 

Flow Contr

ol

If Requi

red

OUT

OUT

OUT

OUT

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

OUT

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

R

G

A

E

R

E

T

NI 

E

S

E

C

P

T

O

R

R

G

R

E

T

NI

 

E

S

A

E

E

C
P

T

O

R

G

R

A

E

R

E

T

NI 

E

S

E

C

P

T

O

R

R

G

A

E

R

E

T

NI

 

E

S

P

E

C

T

O

R

R

G

A

E

R

E

T

NI 

E

S

T

P

E

C

O

R

G

R
A

E

R

E

T

NI

 

E

S

E

C
P

T

O

R

R

G

R

E

T

NI 

E

S

A

E

E

C

P

T

O

R

R

G

A

E

E

C

R

E

T

NI

 

E

S

P

T

O

R

E

R

G

A

E

S

R

E

T

NI 

C

P

E

T

O

R

R

G

E

A
E

S


T

N

R

E
C
P

E
T

O

R

A

E

R

G

E

T

NI 

E

S

R

C

E

P

T

O

R

R

G

A

E
S

R

E

T

NI

 

E

P

E

C

T

O

R

R

G

A

E

S

R

E

T

NI 

E

P

E

C

T

O

R

E

T

NI

 

E

S

A

E

R

G

R

C
P

E
T

O

R

E

R

G

A

E

S

E

T

N

R

C

E

P

T

O

R

E

R

G

A
E

S

R

E

T

NI

 

C

T

P

E

O

R

OUT

OUT

IN

IN

R

G

E

A

E

S

R

E

T

NI 

C

T

P

E

O

R

R

G

E

A
E

S


T

N

R

E
C

T

P

E

O

R

R

G

A

E

E

T

NI 

E

S

R

C

E

P

T

O

R

R

G

A

E
S

R

E

T

NI

 

E

P

E

C

T

O

R

R

G

A

E
S

R

E

T

NI

 

E

C
P

E
T
R

O

A

E

R

G

E

T

NI 

E

S

R

C

P

E

T

R

O

R

G

E

A
E

S

E

T

N

R

C
P

E
T

O

R

E

R

G

A

E

S

R

E

T

NI 

C

P

E

T

R

O

IN

IN

IN

IN

R

G

A

E

S

R

E

T

NI 

E

C

P

E

T

R

O

R

G

A

E

E

T

NI

 

E

S

R

C
P

E
T
R

O

R

G

E

A

E

S

E

T

N

R

C

P

E

O

T

R

R

G

E

A
E

S

R

E

T

NI

 

C
P

E
T
R

O

R

G

A

E
S

R

E

T

NI

 

E

C
P

E
T
R

O

R

G

A

E

E

T

NI 

E

S

R

C

P

E

T

R

O

R

G

E

A
E

S

E

T

N

R

C
P

E
T
R

O

E

R

G

A

E

S

R

E

T

NI 

C

P

E

T

R

O

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

OUT

IN

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

IN

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

OUT

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

IN

R

G

R

E

T

NI 

E

S

A

E

C

E

P

T

O

R

R

G

A

E

R

E

T

NI

 

E

S

E

C
P

T

O

R

R

G

A

E

S

R

E

T

NI 

E

C

R

O

T

P

E

R

G

A

E

E

T

NI

 

E

S

R

C
P

E
T

O

R

R

G

E

A

E

S

C

R

E

T

NI 

P

E

T

O

R

R

G

E

A
E

S


T

N

C

R

E

T

P

E

O

R

R

G

A

E

E

T

NI 

E

S

R

E

C

P

T

O

R

R

G

A

E
S

E

T

NI

 

E

R

P

E

C

T

O

R

R

G

E

A

E

S

T

N

R

E

C

P

E

T

O

R

R

G

E

A
E

S

R

E

T

NI

 

C

T

P

E

O

R

G

R

A

E

R

E

T

NI 

E

S

E

C

P

T

O

R

R

G

E

A

P

E

C

R

E

T

NI

 

E

S

T

O

R

OUT

IN

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

GR

EA

SE

 IN

TE

RC

EP

TO

R

GREASE INTERCEPTOR

OUT

IN

G

R

E

A

S

E

N

T

E

R

E

C

P

T

O

R

G

R

E

A

S

E

I N

T

E

R

C

E

P

T

O

R

G

E

R

A

S

E

N

T

E

R

C

E

P

T

O

R

G

R

E

A

S

E

I N

T

E

R
E

C
P

T

O

R

G

R

E

A

S

E

N

T

E

R

E

C

P

T

O

R

G

R

E

A

S

E

I N

T

E

R
E

C
P

T

O

R

G

R

E

A

S

E

N

T

E

R

C

E

P

T

O

R

G

E

R
A

S

E

I N

T

E

R

C

E

P

T

O

R

G

E

R

A

S

E

N

T

E

R

E

C

P

T

O

R

G

R

E

A

S

E

I N

T

E

R

C

E

P

T

O

R

G

R

E

A

S

E

N

T

E

R

E

C

P

T

O

R

G

R

E

A

S

E

I N

T

E

R
E

C
P

T

O

R

G

E

R

A

S

E

N

T

E

R

C

E

P

T

O

R

G

R

E

A

S

E

I N

T

E

R

C

E

P

T

O

R

G

R

E

A

S

E

N

T

E

R

C

E

P

T

O

R

G

R

E

A

S

E

I N

T

E

R

C

E

P

T

O

R

4075

A

04

  

  

  

4075

A

04M

  

  

  

4075

A

04

  

  

 40

75

A

0

4

M

T

M

A

T

L

P

E

D

E

S

C

R

IP

T

IO

N

 

D

W

G

 B

Y

L

.S

D

W

G

 NUM

B

E

R

: XLSP

40100

A

04

  

  

  

40100

A

04M

  

  

  

40100

A

0

4

T

  

  

  

4

0100

A

04

M

T

40150

A

04

  

  

  

40150

A

04M

  

  

  

40150

A

0

4

T

  

  

  

4

0150

A

04

M

T

C/O

C/O

C/O

C/

C

O

/O

C/

C

O

/O

C/O

C/O

C/O

C/O

C/O

C/O

C/O

C/O

C

/O

C/O

C/O

C

/O

C/O

C/O

C/O

C/O

C/O

C/O

C/O

C/O

C/O

C/O

C/O

C/O

C/O

Exte

rnal 

Flow Contr

o

l

If Requi

red

Exter

nal 

Flow Cont

ro

l

If Requi

red

Exter

n

al 

Flow Contr

ol

If Requi

red

Exte

rnal Flow Cont

ro

l If Requi

red

Flow Cont

rol 

Cleanout

Air Intake

Exter

nal 

Flow Contr

ol

If Requi

red

C/O

C/O

C/O

C/O

C/O

C/

C

O

/O

C/

C

O

/O

C/

C

O

/O

Exter

nal 

Flow Contr

ol

If Requi

red

Exter

n

al 

Flow Contr

o

l

If Requi

red

Exter

n

al 

Flow Contr

ol

If Requi

red

Exter

nal 

Flow Contr

ol

If Requi

red

Exter

n

al 

Flow Contr

o

l

If Requi

red

Exter

n

al 

Flow Cont

rol

If Requi

red

Exter

n

al 

Flow Contr

ol

If Requi

red

G

R

NI

E

S

A

E

R

E

T

C

P

E

T

R

O

G

R

NI

 

E

S

A

E

E

T
R

C
P

E
T
R

O

G

R

E

A

NI

E

S

R

E

T

C

P

E

T

R

O

G

R

NI

 

E

S

A

E

R

E

T

C
P

E
T
R

O

E

n

d

ura

 X

L

 g

rea

se

 in

ter

cept

ors

 are

 r

ate

d

 an

d

 su

p

pli

e

d

 wit

h

 an

 int

e

rn

al 

flow 

cont

rol 

system

 al

re

a

d

in

 pl

ace

T

he

d

o

 no

req

u

ire

 an 

ex

ternal 

flow

 con

trol

 syst

e

m

 o

ai

in

ta

ke 

ven

u

n

le

ss spe

cif

ie

d

 b

lo

c

al 

cod

re

qui

re

ment

s

 

o

b

ei

n

g

 o

perat

e

d

 as 

a

 P

D

G

-101 

install

a

tion

*

E

ndu

ra

 X

L

 g

rea

se

 in

te

rc

ept

o

rs

 a

re

 onl

to

 be

 in

stall

e

d

 i

n

 t

h

ma

n

ne

and 

for 

the 

appli

c

a

tion 

shown

 Con

sult

 lo

cal 

cod

es 

fo

r s

ep

a

ra

te

 t

rap

p

ing

 r

e

qui

re

m

en

ts

c

le

ano

u

lo

cat

io

n

s

 

and additional installation instructions. Full instructional information supplied with every interceptor.    

 

N

O

T

E

S

:

P

R

O

P

R

IE

T

A

R

Y

 AN

D

 C

O

N

F

ID

E

N

T

IA

L

 -

 ©

 C

a

n

p

la

s

 2

0

1

7

D

A

TE

JA

N

20

2

0

 

R

E

V:

 1

.3

C

a

n

p

la

In

d

ustries 

Ltd

.

500 

V

e

teran

s D

rive, Bo

x 1800

B

a

rr

ie

, Ont

ar

io

Canada L4M 4V3

  

CAN: 1-800-461-1771   USA: 1-888-461-5307

Endura brand produc

ts 

manufac

tu

re

d

 b

C

an

pl

as 

In

d

u

st

ri

es

 L

td

.

S

e

ri

e

In

st

a

ll

a

ti

o

n

:

 

·  

S

·  

A

·  

W

 

up

st

r

 

up

st

r

 

 

 

Im

po

rt

an

t:

· 

Ad

eq

ua

te

 p

ro

vis

io

fo

r d

ra

in

 a

cc

ess

 is

 es

se

nt

ia

l. T

w

w

ay

 cl

ea

no

ut

s e

xt

en

de

to

 g

ra

de

 a

re

 re

qu

ire

 

be

f

 

pi

pe

 le

ng

th

 is

 g

re

at

er

 th

an

 3

6”

· 

Co

nn

ec

tio

ns

 to

 ta

nk

 m

ad

w

ith

 a

pp

ro

ve

M

ec

ha

ni

ca

l J

oi

nt

 (M

J)

 co

up

lin

gs

 o

r m

al

pi

pe

 th

re

ad 

 

depe

nd

en

· 

M

an

uf

ac

tu

re

r’s

 in

st

ru

ct

io

ns

 su

ppli

ed

 w

ith

 u

nit

s m

ust

 b

fo

llo

w

ed

(p

ur

ch

as

ed

 se

pa

ra

te

ly

) w

ill

 b

in

st

al

le

up

 st

re

am

 a

fte

r l

as

br

an

ch

 co

nn

ec

tio

no

 fu

rt

he

r t

ha

25

ft 

fro

m

 in

te

rc

ep

to

r

414155BC Cleanout

414155BC 

Cleanout

Ex

ter

nal 

Fl

o

C

on

tr

ol 

If 

requir

ed

Ex

ter

nal 

Fl

o

C

on

tr

ol 

If 

requir

ed

Ex

ter

nal 

Fl

o

C

on

tr

ol 

If 

requir

ed

Ex

ter

nal 

Fl

o

C

o

n

tr

ol 

If 

requir

ed

414226BC

6 x 4 E

x

t. 

R

edu

cer

414130BC

D

ouble

 W

ye

414194BC

45˚ B

end - 

S

tr

eet

414155BC 

Cleanout

414174BC 90˚ B

end

R

e

co

m

m

e

n

d

e

C

o

m

p

o

n

e

n

ts

:

P

a

ra

ll

e

l I

n

st

a

ll

a

ti

o

n

:

 

· 

P

 

applic

ation and should be f

ollo

w

ed

.

· 

In

 

60% of r

·   

W

he

re E

xt

ernal 

Flo

w C

on

tr

ol is not 

requi

red or p

re

fer

re

d, 

 

the par

 

·   

W

he

re pr

ef

er

red or r

equi

re

d, installa

tion of a c

or

re

ctly 

 

r

 

in

 

Flo

w c

on

tr

ol shall be ac

cessible (fr

om g

rade as applic

able) 

 

onc

e oper

ationa

l.

· 

Adequ

at

e pr

ovision 

for d

rain ac

cess is esse

ntial

. T

w

w

ay 

 

cleanouts e

xt

ended 

to g

rade ar

requi

red be

fo

re all tank 

 

inlets and f

ollo

wing all outlet

s. A

cc

ess bet

w

een tanks is also 

 

re

commended if pipe length is g

re

at

er than 36”

· 

Connec

tions 

to tank made with appr

ov

ed Mechani

cal 

 

Join

t (MJ) 

couplings or male pipe thr

ead depende

nt on unit 

 

· 

Manufac

tu

re

r’s instr

uc

tions supplied with units must 

 

be f

oll

ow

ed

A

cc

e

ss

 C

o

v

e

rs

:

 

supplied with CSA B481.0  

Type

 ‘S

’ 

co

ver

s. 

For In

ternal/ ligh

t v

ehi

cular 

(2000 lb S

af

W

or

king L

oad)

2

 n

o

. XL

7

5

 –

 S

E

R

IE

S

 -

 7

5

G

P

M

, 1

1

1

8

 lb

G

re

ase 

C

a

p

a

ci

ty

.

2

 n

o

. X

L7

5

 –

 P

A

R

A

LL

E

L

U

p

 t

o

 1

5

0

G

P

M

, 1

1

1

8

 lb

G

re

ase Ca

p

ac

it

y.

n

o. X

L1

00

 –

 P

A

R

A

LLEL

 U

p

 t

20

0G

P

M, 

21

16

 lb

G

re

ase C

ap

ac

ity

n

o. X

L1

50

 –

 P

A

R

A

LLEL

 U

p

 t

30

0G

P

M, 

21

94

 lb

G

re

ase C

ap

ac

ity

n

o. 

X

L1

00

 –

 P

A

R

A

LL

EL

 U

p

 t

30

0G

P

M,

 3

17

4 l

b

G

rea

se

 C

ap

ac

ity

n

o. 

X

L1

50

 –

 P

A

R

A

LL

EL

 U

p

 t

45

0G

P

M,

 3

29

1 l

b

G

rea

se

 C

ap

ac

ity

4

 n

o

. X

L1

0

0

 –

 P

A

R

A

LL

E

L U

p

 t

o

 4

0

0

G

P

M

4

2

3

2

 lb

G

re

a

se

 Ca

p

a

ci

ty

4

 n

o

. X

L1

5

0

 –

 P

A

R

A

LL

E

L U

p

 t

o

 6

0

0

G

P

M

4

3

8

8

 lb

G

re

a

se

 Ca

p

a

ci

ty

2

 n

o

. XL

1

0

0

 – 

S

ER

IES 

1

0

0G

P

M

, 2

1

1

6

 lb

G

re

ase Ca

p

ac

it

y.

2

 n

o

. XL

1

5

0

 – 

S

ER

IES 

1

5

0G

P

M

, 2

1

9

4

 lb

G

re

ase Ca

p

ac

it

y.

3

 n

o

. XL

1

5

0

 – 

S

ER

IES 

1

5

0G

P

M

, 3

2

9

1

 lb

G

re

ase Ca

p

ac

it

y.

3

 n

o

. XL

1

0

0 – 

S

ER

IES 

1

0

0G

P

M

, 3

1

7

4

 lb

G

re

ase Ca

p

ac

it

y.

4

 n

o

. XL

1

5

0

 – 

S

ER

IES 

U

p

 t

o

 1

5

0

G

P

M

, 4

3

8

8

 lb

G

re

a

se

 Ca

p

a

ci

ty

.

4

 n

o

. XL

1

0

0

 – 

S

ER

IES 

U

p

 t

o

 1

0

0

G

P

M

, 4

2

3

2

 lb

G

re

a

se

 Ca

p

a

ci

ty

.

4

 n

o

. XL

1

5

0

 – 

S

ER

IES 

U

p

 t

o

 1

5

0

G

P

M

, 4

3

8

8

 lb

G

re

a

se

 C

a

p

a

ci

ty

.

4

 n

o

. XL

1

0

0

 – 

S

ER

IES 

U

p

 t

o

 1

0

0

G

P

M

, 4

2

3

2

 lb

G

re

a

se

 C

a

p

a

ci

ty

.

C

anplas 

P

ar

t#

Description

Q

T

Y

414155BC

SDR35

 T

w

W

a

y Cleanout - 

H

xH

xH

414174BC

SDR35 90˚ B

end - S

tr

eet - H

xSpg

414130BC

SDR35  D

ouble

 W

ye - 

H

xH

xH

xH

414226BC

SDR 35 6 x 4 E

x

t. 

R

edu

cer H

xSpg

414194BC

SDR 35 45˚ B

end - S

tr

eet

4044275

Endur

a® XL 75

g

pm 

Fl

o

w C

on

tr

ol

40442100

Endur

a® XL 100g

pm 

Fl

o

w C

on

tr

ol

*

PDI G-101, ASME A112.14.3 TYPE A, AND NSF ES 15741 APPLICABLE TO 75 AND 100 GPM MODELS ONLY

Summary of Contents for 40100A04

Page 1: ...appurtenance your Endura grease interceptor MUST be isolated from the drainage system in the event that nal drain testing or other system pressure testing is required DO NOT under any circumstances s...

Page 2: ...latest addition to the proven line of Endura Grease Management products We have spent many thousands of hours in the development of Endura XL our aim being simple to produce the industry s best Hydrom...

Page 3: ...heck review building plumbing pretreatment sewer and waste water Bottom line those who enforce the rules and regulations Cost Index A way of indicating the relative cost of different types of intercep...

Page 4: ...mum safety factor of 2 shall be applied in calculation design Concrete Anchor Base if anchoring is required Min 6 Inle O t utlet Min 12 Min 12 Min 8 6 Minimum Base of Crushed aggregate material approx...

Page 5: ...Extension Installation Guide 8 Finish to grade floor For in ground applications with vehicular traffic the upper 8 requires a reinforced concrete slab Refer to the Installation Specification section o...

Page 6: ...150 gpm tank 4 Spigot connections with S Rated Lids 1 40150A04 Endura XL 150 gpm tank 4 Spigot connections with M Rated Lids 1 40150A04M Endura XL 150 gpm tank 4 Threaded connections with S Rated Lid...

Page 7: ...hall additionally operate with an air balanced environment to equalize variation in internal pressures being controlled and maintained with an appropriately sized air balance means be supported by a L...

Page 8: ...ongitudinally 1 6 anchoring may however be necessary as determined by the specifying engineer Tie down locations are incorporated to the tank and can be used in conjunction with coated stainless steel...

Page 9: ...y specifying engineer 2 BACKFILLING FINISHED CONCRETE SLAB TRAFFIC LOAD RATED AASHTO 304 H20 16 000lbs and approved to CSA B481 0 Class S 20 F to 100 F 29 C to 38 C 2 1 Preparation of sub grade per lo...

Page 10: ...ol If Required External Flow Control If Required GR N I E S A E R E T C P E T R O GR N I E S A E E T RC P E T R O GREA N I E S R E T C P E T R O GR N I E S A E R E T C P E T R O Endura XL grease inter...

Page 11: ...criterial are met See Page 12 Trapping equivalent in compliance with applicable plumbing code requirements Venting The installation of the interceptor shall be vented downstream in accordance with lo...

Page 12: ...main drain line connected to the interceptor The remain accessible for maintenance and The location of the cleanout should be recorded in you Installer Hand Over Check List See Page 14 is important th...

Page 13: ...enetration tank seal Part 40100 TPS into the opening prepared and lubricate well using silicone pipe lubricant 6 As the orientation of the pipe when installed is important mark or identify on the top...

Page 14: ..._______ Connections Cleanouts Mark where installed Extension Risers added Yes if Yes approx length of riser installed _________in m No Flow Control Handle Extended Yes No See Riser Extension Instructi...

Page 15: ...place and well tightened MissingboltsMUSTbereportedtomanagementandreplacedimmediately Covers MUST meet the required load rating for the application see the Technical Information section Do NOT use alt...

Page 16: ...ght sampling air balance cap must be raised also Air Balance Hole Maintenance IMPORTANT Regular Removal of Fat Oil and Grease Due to the capacity of your Endura XL Grease Interceptor it is necessary t...

Page 17: ...of damage to the internal flow control where fitted by rooting or other equipment Access to the Outlet Well Although essentially a closed area the outlet system is able to be accessed by removal of th...

Page 18: ...olume of Waste Removed _____________________ Gallons Liters Inlet Baffle Opened Inspected Yes No Flow Control Checked Cleaned Yes No Note The flow control device internal or external shall be inspecte...

Page 19: ...equency I think I have missing parts Parts have been removed or lost during prior servicing Check exploded drawing in this manual to confirm the parts that are supposed to make up your interceptor mod...

Page 20: ...Load Drainage Period 70 84 1 min 70 84 l p m 70 84 2 min 35 42 l p m 5 Select Interceptor falls between two sizes select the larger of the two interceptors For a one minute drainage period For a two m...

Page 21: ...ivalent is not directly achievable by application of a standard formula As an experienced manufacturer in the Grease Management market we have been able to identify and validate a a manufacturers reco...

Page 22: ...nce will be proportionally less too Rates will vary significantly by region and by contractor Always use a licensed or approved contractor to maintain your interceptor Do Endura XL tanks need to be di...

Page 23: ...th the Products or on Manufacturer s website ii the Products have been installed and used in strict compliance with Manufacturer s written instructions as published and updated from time to time by Ma...

Page 24: ...Email us feedback endurainterceptor com Limited LifetimeWarranty Registration Card Congratulations on your purchase of the Endura XL Grease Interceptor This product is supplied with a the manufacturer...

Reviews: