
Installation - Flow Controls
- 12 -
Max. 25ft
F
C
D
A
ir
I
n
ta
k
e
PDI
External Flow
Control. Located
as close as possible to
the last fixture
Cleanout
Sink
Flow
External Flow
Control:
When installed with an
External Flow Control, the
seal shown above are removed
during installation.
will now be performed by a separate
device that will be installed upstream
from the interceptor. This is located as
close as possible to the appliances and
branch connection to the main drain
line connected to the interceptor. The
remain accessible for maintenance and
The location of the cleanout should be
recorded in you Installer Hand Over
Check List (See Page 14)
is important that it be opened and checked
periodically (min. twice annually) to ensure
there is no build up or blockage occurring that
Remove
plate
Remove
Flow Controls
Depending on preference or requirement
Endura® XL can be operated with an internal
Internal Flow Control:
of the hydromechanical grease
interceptor and its function.
Flow
control
plate
Flow
control
seal
Inlet
*
*
*
PDI G-101, ASME A112.14.3 TYPE A, AND NSF ES 15741 APPLICABLE TO 75 AND 100 GPM MODELS ONLY