![Endura 40100A04 Installation Operation & Maintenance Download Page 14](http://html1.mh-extra.com/html/endura/40100a04/40100a04_installation-operation-and-maintenance_2408642014.webp)
Installer Handover Checklist
- 14 -
I
nstallation made by (Company) ___________________________________________________________
Installer (Name)
__________________________________________________________________
Installer Contact (Tel) _________________________________
Completed on (Date) _________________________________
Model Installed:
Lid:
❑
Endura XL100 (40100A04 (T) / 100GPM)
❑
Endura XL150 (40150A04 (T) / 150GPM)
❑
M-Rated
❑
S-Rated
❑
Endura XL75 (4075A04 (T) / 75GPM)
Installation Format:
❑
On-Floor
❑
In Floor - Inside Building
❑
Floor Below (eg. basement)
❑
In-Ground - Outside building
❑
Yes
❑
No (See Page 8-9)
Flow Control Format:
❑
❑
External (Upstream of Interceptor)
If External Flow Control …
Internal Flow Control plate removed
❑
Yes
❑
No (See Page 12)
Flow Control Location(s) ____________________________________________________
Connections & Cleanouts (Mark where installed):
Extension Risers added:
❑
Yes - if Yes, approx. length of riser installed: _________in /m
❑
No
Flow Control Handle Extended:
❑
Yes
❑
No (See Riser Extension Instructions))
Air Balance/Sampling Cap in place:
❑
Yes
❑
No (If No, Replacement required. See Page 16)
Entered Information on Warranty Page
❑
Yes
❑
No
Have feedback? Email us at… [email protected]
Installer Handover Checklist
The following checklist completed by your installer provides key information regarding your Endura® XL grease interceptor
and the way it has been installed. If it is not completed contact your installer and complete with them by phone or other
appropriate means.
G
E
T
NI
E
S
A
E
R
P
E
C
R
T
R
O
T
NI
E
S
A
E
R
G
C
R
E
R
O
T
P
E
G
E
T
NI
E
S
A
E
R
P
E
C
R
T
R
O
C
R
E
T
NI
E
S
A
E
R
G
R
O
T
P
E
Cleanout
OUT
IN
Cleanout
Cleanout
External
*
*
*
Flow
Control
Cleanout
*
PDI G-101, ASME A112.14.3 TYPE A, AND NSF ES 15741 APPLICABLE TO 75 AND 100 GPM MODELS ONLY