Commissioning
Micropilot S FMR531 with HART/4...20 mA
40
E Hauser
6
Commissioning
6.1
Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist “Post installation check” (see Page 23).
• Checklist “Post connection check” (see Page 29).
6.2
Switching on the measuring device
When the instrument is switched on for the first time, the following messages appear on the display:
⇒
⇓
After 5 s, the following message appears
⇓
After 5 s, the following message appears
⇓
After 5 s or after you have pressed
F
the following
message appears
Select the language
(this message appears the first time the instrument is
switched on)
⇓
Select the basic unit
(this message appears the first time the instrument is
switched on)
⇓
The current measured value is displayed
⇓
After
F
is pressed, you reach the group selection.
This selection enables you to perform the basic setup
E HAUSER
E
+
–
Summary of Contents for Micropilot S FMR531
Page 4: ...Brief overview Micropilot S FMR531 with HART 4 20 mA 4 Endress Hauser ...
Page 87: ...Micropilot S FMR531 with HART 4 20 mA Technical data Endress Hauser 87 ...
Page 98: ...Micropilot S FMR531 with HART 4 20 mA Index 98 Endress Hauser ...
Page 100: ...www endress com worldwide BA207F 00 en 04 09 71093754 CCS FM SGML 6 0 ProMoDo 71093754 ...