3
Installation
The following procedure should be followed
for a complete measuring system installation:
• Installation or attachment transmitter
(see chap. 3.3)
• Selection and connection of cable and
sensor (see chap. 3.4, 3.5 and 9)
• Installation is followed by start-up
(see chap. 5).
3.1
Measuring system
The complete measuring system comprises:
• The Liquisys M CUM 223 or CUM 253
transmitter
• A sensor with integrated temperature
sensor and a permanently attachedcable
• An installation assembly
Optional:
• Extension cable CYK 8
• Junction box VBM or RM
HAUSER
LIQUISYS S
CAL
REL
REL 1
REL 1
ALARM
REL 2
REL 2
E
HAUSER
LIQUISYS S
CAL
REL
REL 1
REL 1
ALARM
REL 2
REL 2
E
Sensor cable
Liquisys M CUM 253
Flow assembly CUA 250
Retractable
assembly
CUA 461
UM2X3SYS.CDR
Liquisys M CUM 223
Immersion assembly
CYA611
Fig. 3.1
Complete measuring
system consisting of
Liquisys M CUM 223 /
253 with measuring cable,
assembly and turbidity
sensor
Installation
Liquisys M CUM 223 / 253
6
Hauser