37742-0-1116
Page 3
ATTENTION INSTALLER:
Follow this Standard Work Checklist
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instruction manual.
Customer: _____________________________________
Lot/Address: ___________________________________
_______________________________________________
Model: ________________________________________
Date Installed: __________________________________
Fireplace Location: ______________________________
Installer: _______________________________________
Dealer Phone #: _________________________________
Serial # ________________________________________
Empire recommends the following:
•
Photograph the installation and copying this checklist for your file.
•
Keep this checklist visible on the fireplace until the installation is complete.
Comments:
Further description of the issues, who is responsible (Installer/Builder/Other, etc) and corrective action needed:
___________________________________________________________________________________________________________
Comments communicated to party responsible
_____________________
by
_____________________
on
______________________
DVCT(36,40)CFP95(N,P)-1
FIREPLACE INSTALLATION
COMMENTS
Verified clearances to combustibles. (pg 12) .......................................................................
o
____________________
Fireplace is leveled and secured. ........................................................................................
o
____________________
VENTING/CHIMNEY/PowerFlow™ HEAT DISTRIBUTION
Venting configuration complies to vent diagrams. (pg. 27) ..................................................
o
____________________
Venting installed, locked, secured in place with correct clearance. .....................................
o
____________________
Firestops installed. ...............................................................................................................
o
____________________
Exterior wall/roof flashing installed and sealed. ...................................................................
o
____________________
Terminations installed and sealed. (pg 28-31) .....................................................................
o
____________________
Light unit and test venting before enclosing the fireplace. (pg 59) ......................................
o
____________________
ELECTRICAL (pg 16-17)
Unswitched power (110-120 VAC) provided to the appliance. ............................................
o
____________________
GAS (pg 15)
Proper appliance for fuel type. .............................................................................................
o
____________________
Was a conversion performed? ..............................................................................................
o
Yes
o
No
Leak check performed and inlet pressure verified ................................................................
o
____________________
FINISHING ( pg 19)
Non-combustable board used as required. ..........................................................................
o
____________________
Verified all clearances meet installation manual requirements. ...........................................
o
____________________
Mantels and wall projections comply with installation manual requirements. ......................
o
____________________
Granite or Clean Face finishing complete and complies with clearance
requirements in installation manual. ....................................................................................
o
____________________
Barrier screen for glass properly installed. ..........................................................................
o
____________________
FIREPLACE SETUP
All packaging and protective materials removed (inside & outside of appliance) . ...............
o
____________________
Media installed correctly. .....................................................................................................
o
____________________
Firebox glass assembly cleaned, installed, and secured. ...................................................
o
____________________
Accessories installed properly. ............................................................................................
o
____________________
Manual envelope and all of its contents are removed from inside/outside the
appliance and given to party responsible for use and operation. ........................................
o
____________________
Started Appliance and verified no gas leaks exist. ..............................................................
o
____________________
Summary of Contents for DVCT36CFP95-1
Page 37: ...37742 0 1116 Page 37 LOG AND EMBER PLACEMENT 1 Place Ember Bed A onto burner pins 3 and 4 ...
Page 38: ...37742 0 1116 Page 38 LOG PLACEMENT 2 Place Log B onto burner pins 1 and 2 ...
Page 43: ...37742 0 1116 Page 43 LOG PLACEMENT 7 Place Log E onto burner pin 5 and the pin on Ember Bed A ...
Page 55: ...37742 0 1116 Page 55 THIS PAGE IS INTENTIALLY LEFT BLANK ...