370XA Gas Chromatograph
System Reference Manual
APRIL 2014
7P00370-H01
6 - 17
20.
Place an o-ring (1) over each actuation gas port hole (2). The
holes are located on the actuation base plate.
21.
Place the primary diaphragm (1), which has four holes, so that
the holes in the diaphragm align with the two guide pins and
the two actuation gas ports with the o-rings.
Summary of Contents for Rosemount 370XA
Page 1: ...Revision A 7P00370 H01 April 2014 370XA Gas Chromatograph System Reference Manual ...
Page 32: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 3 5 3 3 2 2 Dimensions ...
Page 137: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 5 8 ...
Page 138: ...6 1 Section 6 Overhauling the maintainable module ...
Page 177: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 6 40 Column 2 ...
Page 178: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 6 41 Column3 ...
Page 179: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 6 42 Column 4 ...
Page 182: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 6 45 Sample Loop SL ...
Page 195: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 8 ...
Page 198: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 11 ...
Page 199: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 12 ...
Page 200: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 13 ...
Page 202: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 15 ...
Page 204: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 17 ...
Page 205: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 18 ...
Page 206: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 19 ...