System Reference Manual
370XA Gas Chromatograph
7P00370-H01
APRIL 2014
4 - 34
•
If the validation is to be done with a gas other than the
calibration gas on a single-stream GC, select
Calibration
from the
Stream Valve
drop-down list and install a manual
three-way valve before the calibration inlet on the sample
conditioning system.
•
If the validation is to be done with gas other than the
calibration gas on one of the streams of a multi-stream GC,
select the appropriate stream valve from the
Stream Valve
drop-down list.
4.
If you are using the calibration gas or if the validation gas is
permanently installed and you want to run a validation on a
schedule, do the following:
(a.) Select
the
check
box in the appropriate
Auto
column.
(b.) Select
the
Start Time
for the first validation.
(c.) Enter
the
Interval
, in hours, between validation runs.
NOTICE
If you are configuring an auto-validation and an auto-calibration, schedule the
validation run to occur at least 30 minutes before the calibration run to provide a
validation of the measurement just before the calibration cycle re-calculates the
response factors.
5.
Click
OK
to save the data and close the
Streams
window.
6.
Select
Validation Data
on the
Application
menu. The
Validation Data
window opens.
NOTICE
The Validation Data command will not be available on the Application menu unless
at least one stream is assigned to Validate in the Usage column on the Streams
window.
7.
Select the
Variables
to be validated and enter the
Nominal
Value
and the
Percent Deviation
for each. Note that the C+
button will fill the next entry with the next component in the
component data table from the previously entered component
Summary of Contents for Rosemount 370XA
Page 1: ...Revision A 7P00370 H01 April 2014 370XA Gas Chromatograph System Reference Manual ...
Page 32: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 3 5 3 3 2 2 Dimensions ...
Page 137: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 5 8 ...
Page 138: ...6 1 Section 6 Overhauling the maintainable module ...
Page 177: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 6 40 Column 2 ...
Page 178: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 6 41 Column3 ...
Page 179: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 6 42 Column 4 ...
Page 182: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 6 45 Sample Loop SL ...
Page 195: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 8 ...
Page 198: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 11 ...
Page 199: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 12 ...
Page 200: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 13 ...
Page 202: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 15 ...
Page 204: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 17 ...
Page 205: ...System Reference Manual 370XA Gas Chromatograph 7P00370 H01 APRIL 2014 7 18 ...
Page 206: ...370XA Gas Chromatograph System Reference Manual APRIL 2014 7P00370 H01 7 19 ...