136
Installation, Operation, and Performance Qualification
Revalidation Schedule
The purpose of revalidation is to ensure that already validated instrument systems remain up to date and
continue to be fit to operate.
ELITechGroup recommends the IQ, OQ, and PQ on a schedule to maintain qualification of the system,
unless instrument malfunction requires significant repair or service prior to the one-year recommendation.
If repair is required, revalidation is recommended. Routine maintenance is not considered repair.
Revalidation timeline depends also on operation conditions of the instrument, may be regulated by local
authorities and/or by the internal regulations of the company/institution in which it is installed.
On a routine basis, a daily precision test and a monthly check of the measurement system by means of the
adjustment tool is recommended.
A detailed description can be found in this User’s Manual, Chapter
Maintenance and Troubleshooting
.
Revalidation determined by (name) .............................................. (date) ............................
Next Servicing as described in the
Service Guide should be performed on (date): ............................
COMMENTS
..........................................................................................................................................................................
..........................................................................................................................................................................
Date ............................
Completed by ..............................................
Date ............................
Verified by ..............................................
Summary of Contents for FreezePoint 6000 Series
Page 1: ...FreezePoint Freezing Point Osmometer USER S MANUAL MODEL 6000 6000P 6000S 6000SP...
Page 2: ......
Page 137: ......