Firing Pin rotates downward to the end,
then turn back two circles as fixed base
Adjust spray valve glue pressure, will
inpact glue amount
Spray valve On, set time to 4ms
專屬噴射閥軟體調整
This interface function is empty run
and move to next working point to add
height
Spray valve DryRun height base fixed
to 3000um
Click z axis height to perform
connected PCB work
(Aware: Pcb board components should
be less than 3000um, Otherwise will
collide with components.)
Z axis base height: touch auto search
point, after height conformation, Spray
valve dispense height set to fixed
3000um
Z axis base height: touch auto search
point, after height conformation, Spray
valve dispense height set to fixed
3000um
Summary of Contents for 5701N
Page 3: ...Pic 1 3 ...
Page 6: ...Pic 1 3 ...
Page 11: ...Pic 1 ...
Page 13: ...Pic 1 3 ...
Page 16: ...12 Red disk will show click left key of mouse to save system file ...
Page 18: ...Pic 1 ...
Page 20: ......
Page 24: ...3 Check if valve is clogged 4 Check if needle is clogged ...
Page 43: ...Plastic Needle head specifications When to use Choose needle size according to glue amount ...