2
Chek list in case of the alarm E11 between Blast chiller/frezeer and remote
cooling unit
1.1
Alarm E11
:
compressor thermic protection alarm
Electric wiring closes between AT & AT in the terminal board (as electric wiring diagram)
1.
Open the electric box and turn on the swicth
11Q1(picture 3)
2.
Check the power supply (24) in the
Blue light
(H1)in the box of the remote cooling unit
1.2 Without power suppy on (
H1 blue light
)or blue light wicthed off in the electric box:
1.
Check the power supply 380V on internal electric box (11Q1)
2.
Check the fuses in the electric box
H1
H2
H3
24 V
1
3
2
11Q1
Summary of Contents for BLAST CHILLER LW
Page 1: ...BLAST CHILLER LW 595R18700 ...
Page 3: ...Electronic control Cruise version CRUISE version ...
Page 53: ...Blast Chiller or Freezer First point installation Code check Safety device Description ...
Page 92: ...Remote cooling unit information What you must know to respect a correct installation ...
Page 102: ... T1 T2 AP AP AT AT Electrical connection Find the terminals inside the electrical box ...