Evacuating the lines and charging
with refrigerant gas
Leakage test
Wash the inlet and delivery pipes with pressurised dry nitrogen;
Connect a nitrogen cylinder to the high and low pressure connectors, making sure to also
install a pressure gauge (using a “T“ union), and charge the high and low pressure lines with
gas to a pressure of approximately 15 bar (217.5 psi);
Close the cylinder cock and, after at least 1 hour, check that the pressure has not dropped
below the previous reading level;
Vacuum
Empty the circuit manually by opening the cocks on the unions;
Connect the pipes to a vacuum pump (preferably a twostage model with vacuum gauge
and high and low pressure connectors);
Reach a vacuum level equal to or lower than 70mTorr (0,0931 mbar / 0.00135 psig).
On reaching this vacuum level, maintain it for at least 30 minutes;
Charge the unit as follows:
104
Summary of Contents for BLAST CHILLER LW
Page 1: ...BLAST CHILLER LW 595R18700 ...
Page 3: ...Electronic control Cruise version CRUISE version ...
Page 53: ...Blast Chiller or Freezer First point installation Code check Safety device Description ...
Page 92: ...Remote cooling unit information What you must know to respect a correct installation ...
Page 102: ... T1 T2 AP AP AT AT Electrical connection Find the terminals inside the electrical box ...