79
10. Menu System
Fig. 10.22: Test plan - load
- Edit the test plan. It is possible:
delete
- a parameter set in the test plan,
before
- includes the new parameter set before the marked into
the list.
behind
- includes the new parameter set behind the marked into
the list.
Fig. 10.23: Test plan - includes parameter sets
10.5.1
Load test plan / Auto testing
Opens a list of all defined test plans. Mark and load a test plan of the list
for auto testing.
load
load
ins/del
Combi-tester G7-1G/-1H/-1T/-1U
1 HV AC
2 HV AC
load
load
load
load
Test plan
scroll to list start
testplan list
scroll to list end
- Open the test plan by touch to the button "edit" " (eg. 2HV AC).
Note
: In this example, the test plan name shows the function of the test
plan. The plan includes two parameter sets for HV-test.
back to menu before
parameter sets
function buttons
HV_1500 AC ....
HV_2000 AC ....
ins/del
ins/del
ins/del
ins/del
test
2HV AC
Summary of Contents for G7-1G
Page 5: ...5 1 INTRODUCTION free page Combi tester G7 1G 1H 1T 1U...
Page 38: ...38 4 Operating modes 4 2 Normal Mode Test sequence Combi tester G7 1G 1H 1T 1U...
Page 39: ...39 4 Operating modes 4 2 1 HV IS test normal mode Combi tester G7 1G 1H 1T 1U...
Page 40: ...40 4 Operating modes 4 2 2 PE test normal mode Combi tester G7 1G 1H 1T 1U...
Page 41: ...41 4 Operating modes 4 2 3 Normal mode input step Combi tester G7 1G 1H 1T 1U...
Page 42: ...42 4 Operating modes 4 2 4 Normal mode output step Combi tester G7 1G 1H 1T 1U...
Page 43: ...43 4 Operating modes 4 2 4 Normal mode time step Combi tester G7 1G 1H 1T 1U...
Page 44: ...44 4 Operating modes 4 3 Fast Start Mode test sequence Combi tester G7 1G 1H 1T 1U...
Page 45: ...45 4 Operating modes 4 3 1 Fast Start Mode PE HV ISO Test Combi tester G7 1G 1H 1T 1U...