124
12. Input/Output test step
12.6 Load and execute test plans (Input/Output)
Prerequisite: See chapter 12.5.
Note:
The execution of test plans is possible in manual mode or in auto-
matic mode. The setting is made in the menu "Setup - Test plan mode".
See also chapter 10.4 - illustr.. 10.41.
Test plan mode - step:
The start of test-steps must be done by
user-input (eg, push button).
Test plan mode - auto:
Test-steps are running as sequence au-
tomatically.. Only if "error" an operator intervention is required.
Choose "test plan" in the main menu.
Choose "Load test plan" in the main "test plan".
Choose the desired test plan at the list. See also chapter 10.5.
It is possible to edit the loaded test plan on this place (insert or delete
parameter blocks).
12.6.1 Start /execute test plan (auto- mode)
Note:
Test-steps are running as sequence automatically.
Combi-tester G7-1G/-1H/-1T/-1U
Summary of Contents for G7-1G
Page 5: ...5 1 INTRODUCTION free page Combi tester G7 1G 1H 1T 1U...
Page 38: ...38 4 Operating modes 4 2 Normal Mode Test sequence Combi tester G7 1G 1H 1T 1U...
Page 39: ...39 4 Operating modes 4 2 1 HV IS test normal mode Combi tester G7 1G 1H 1T 1U...
Page 40: ...40 4 Operating modes 4 2 2 PE test normal mode Combi tester G7 1G 1H 1T 1U...
Page 41: ...41 4 Operating modes 4 2 3 Normal mode input step Combi tester G7 1G 1H 1T 1U...
Page 42: ...42 4 Operating modes 4 2 4 Normal mode output step Combi tester G7 1G 1H 1T 1U...
Page 43: ...43 4 Operating modes 4 2 4 Normal mode time step Combi tester G7 1G 1H 1T 1U...
Page 44: ...44 4 Operating modes 4 3 Fast Start Mode test sequence Combi tester G7 1G 1H 1T 1U...
Page 45: ...45 4 Operating modes 4 3 1 Fast Start Mode PE HV ISO Test Combi tester G7 1G 1H 1T 1U...