64
10. Menu System
RUN
2x
high voltage
RUN
2x
load parameter
manual test
10.1.1
Overview, HV test example
test plan
test plan
test plan
test plan
delete
create
edit
load
Test plan
Isolation
PE
p
arameter set
parameter set
parameter set
parameter set
delete
create
edit
laad
Parameter set
HV_3-step
ISO_HV
1ISO_2HV
2ISO_2HV
load
load
load
load
Test plan
Fast-Start-Mode
Fast-Start-Mode
test plan
auto test
Combi-tester G7-1G/-1H/-1T/-1U
burn
test step 2 off 2
test time or
permanent testing
max. 999.9s
test mode
actual test time
1 HV AC
2 HV AC
load
load
load
load
Test plan
0.00 [kV]
00.00 [mA]
000.0 [s]
load
HV_1500 AC
Status: Ready for test!
Start test with RUN!
: HV (AC)
: 1.50 kV
: 0.50 kV/s
: off
: off
: 1.20 kV
: 6.0 s
: off
: 10.0 mA
: 2.00 mA
mode
U
Umin
t
delay
Imax
Imin
0.00 [kV]
02.21 [mA]
006.0 [s]
2HV AC
Status: Test OK
No fault - Accept
: HV (AC)
: 2.00 kV
: 0.10 kV/s
: off
: off
: 1.70 kV
: 6.0 s
: off
: 10.0 mA
: 2.00 mA
mode
U
Umin
t
delay
Imax
Imin
2/2
HV_1500 AC
HV_2000 AC
HV_3000 AC Ramp up
HV_4000 AC Ramp u/d
load
load
load
load
Parameter set
test mode .................
test voltage .........[kV]
run-up ...............[kV/s]
run-back ...............[kV/s]
off
0.10
1.50
HV
test
HV_1500 AC
0.00 [kV]
00.00 [mA]
000.0 [s]
load
HV_1500 AC
Status: Ready for test!
Start test with RUN!
: HV (AC)
: 1.50 kV
: 0.50 kV/s
: off
: off
: 1.20 kV
: 6.0 s
: off
: 10.0 mA
: 2.00 mA
mode
U
Umin
t
delay
Imax
Imin
1.50 [kV]
02.50 [mA]
003.1 [s]
HV_1500 AC
Status: HV-test
Attention: High Voltage
: HV (AC)
: 1.50 kV
: 0.50 kV/s
: off
: off
: 1.20 kV
: 6.0 s
: off
: 10.0 mA
: 2.00 mA
made
U
Umin
t
delay
Imax
Imin
HV_1500 AC ....
HV_2000 AC ....
ins/del
ins/del
ins/del
ins/del
test
2HV AC
Summary of Contents for G7-1G
Page 5: ...5 1 INTRODUCTION free page Combi tester G7 1G 1H 1T 1U...
Page 38: ...38 4 Operating modes 4 2 Normal Mode Test sequence Combi tester G7 1G 1H 1T 1U...
Page 39: ...39 4 Operating modes 4 2 1 HV IS test normal mode Combi tester G7 1G 1H 1T 1U...
Page 40: ...40 4 Operating modes 4 2 2 PE test normal mode Combi tester G7 1G 1H 1T 1U...
Page 41: ...41 4 Operating modes 4 2 3 Normal mode input step Combi tester G7 1G 1H 1T 1U...
Page 42: ...42 4 Operating modes 4 2 4 Normal mode output step Combi tester G7 1G 1H 1T 1U...
Page 43: ...43 4 Operating modes 4 2 4 Normal mode time step Combi tester G7 1G 1H 1T 1U...
Page 44: ...44 4 Operating modes 4 3 Fast Start Mode test sequence Combi tester G7 1G 1H 1T 1U...
Page 45: ...45 4 Operating modes 4 3 1 Fast Start Mode PE HV ISO Test Combi tester G7 1G 1H 1T 1U...